REDACTED DUE TO SUPPLIER
Spent by
Lancashire County Council with REDACTED DUE TO SUPPLIER
Total spend £5,334,826
Average monthly spend £1,333,706
No information known about this supplier. Help us identify this company/supplier
| Date | Department | Category | Value |
|---|---|---|---|
| March 11 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £39,343.00 |
| March 11 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £5,826.00 |
| March 11 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,012.00 |
| March 29 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £5,826.00 |
| March 29 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,012.00 |
| March 29 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £39,343.00 |
| March 2 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,784.00 |
| March 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| March 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| March 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| March 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| March 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,790.40 |
| March 3 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,244.16 |
| March 9 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,433.76 |
| March 9 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,902.68 |
| March 9 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,113.08 |
| March 9 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,577.52 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,487.50 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,244.16 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,433.76 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,902.68 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,113.08 |
| March 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,577.52 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,010.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,206.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,273.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-171.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,129.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,282.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,558.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-745.96 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,251.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,079.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,902.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,011.21 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,647.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,856.59 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,032.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,030.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,269.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-848.16 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,180.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-600.96 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,364.88 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,659.58 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-430.19 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £589.71 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,391.43 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-43.06 |
| March 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,564.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,311.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,777.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,282.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,022.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,276.64 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,528.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,127.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,183.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,553.36 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £951.32 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,370.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,364.88 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,182.88 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,216.72 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £12,793.72 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,157.25 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,360.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-404.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,215.74 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,542.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,182.88 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £958.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-268.95 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,154.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,069.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,261.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,188.58 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-756.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,245.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £996.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.12 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-591.08 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,194.28 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-494.64 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,191.08 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-491.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,438.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,104.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-833.76 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,152.04 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,315.15 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,132.51 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £786.28 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,582.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £546.86 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-118.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,376.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-244.20 |
| March 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,287.40 |
| March 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,315.92 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-774.08 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,249.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,708.84 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,202.91 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-571.76 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-753.56 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £245.72 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,965.67 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-53.82 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,375.55 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,661.71 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-442.62 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,245.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,739.69 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,100.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,269.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,612.83 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-424.09 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,227.79 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-442.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,314.01 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-433.71 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,082.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-817.05 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £293.85 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,461.03 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,367.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,211.97 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,320.32 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,196.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,054.32 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-233.00 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,855.12 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,207.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,273.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £933.71 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-265.86 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-478.38 |
| March 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,687.32 |
| March 22 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,156.00 |
| March 14 2011 | ACS - REVENUE DFM | TRAINING - ADULT SOCIAL CARE | £1,500.00 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,064.80 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £3,624.40 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £968.00 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £572.50 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,452.00 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £2,843.00 |
| March 8 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,276.00 |
| March 9 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £580.80 |
| March 10 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,632.10 |
| March 25 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £711.10 |
| March 25 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £638.00 |
| March 10 2011 | ACS - REVENUE DFM | LIBRARIES - MORECAMBE | £568.46 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,686.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,522.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,428.00 |
| March 9 2011 | ACS - REVENUE DFM | MUSEUMS - SCHOOL MUSEUMS SERVICE | £500.00 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £956.80 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-83.40 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £11,951.20 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,268.52 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,559.68 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £24,256.10 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-10.76 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,798.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,764.43 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-1,044.13 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £21,672.09 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,673.56 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £20,313.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,690.57 |
| March 21 2011 | ACS - REVENUE DFM | SP PROGRAMME - OLDER PEOPLE | £1,724.40 |
| March 18 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £697.00 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,548.00 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,291.64 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,169.00 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £616.00 |
| March 1 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,816.00 |
| March 1 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £908.00 |
| March 3 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £7,861.12 |
| March 3 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,502.48 |
| March 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-25.52 |
| March 25 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,091.56 |
| March 24 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £7,861.12 |
| March 24 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,502.48 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,533.73 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,024.12 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,752.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £408.66 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-64.59 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £20.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £9,353.89 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-32.29 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,668.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,271.40 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £445.14 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,044.00 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-284.60 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| March 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,088.76 |
| March 9 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM NORTH | £678.36 |
| March 22 2011 | CORPORATE | C&YP - OTHER SCHOOLS BUDGET | £657.89 |
| March 31 2011 | CORPORATE | LCES HIGHWAYS | £1,200.00 |
| March 2 2011 | CORPORATE | OTHER | £500.00 |
| March 2 2011 | CORPORATE | OTHER | £500.00 |
| March 1 2011 | CORPORATE | HIGHWAYS EL | £1,035.00 |
| March 4 2011 | CORPORATE | HIGHWAYS EL | £450.00 |
| March 9 2011 | CORPORATE | HIGHWAYS EL | £7,307.83 |
| March 14 2011 | CORPORATE | DELEGATED SCHOOLS | £1,000.00 |
| March 14 2011 | CORPORATE | HIGHWAYS EL | £525.00 |
| March 31 2011 | CORPORATE | OTHER | £450.00 |
| March 4 2011 | CYP - LCC BUDGET - DFM | PRESTON EAST CC | £800.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £525.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £562.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £960.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,200.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,400.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,575.00 |
| March 28 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £748.11 |
| March 21 2011 | CYP - LCC BUDGET - DFM | STAGHILLS CC | £429.00 |
| March 14 2011 | CYP - LCC BUDGET - DFM | BALLADEN CC | £1,000.00 |
| March 31 2011 | CYP - LCC BUDGET - DFM | WHITWORTH (ST BARTHOLOMEW) CC | £1,471.00 |
| March 1 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £813.71 |
| March 15 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,195.71 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £784.28 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £-540.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 1 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,850.00 |
| March 1 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £710.50 |
| March 2 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,500.00 |
| March 7 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,148.05 |
| March 7 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-1,929.45 |
| March 7 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,156.50 |
| March 4 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| March 7 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,993.70 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-5,987.40 |
| March 9 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £354.29 |
| March 9 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £491.57 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £700.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,756.80 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,405.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,785.80 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £11,635.20 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,210.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,753.30 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,405.00 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,756.80 |
| March 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 17 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £214.29 |
| March 17 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £400.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,259.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,833.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,688.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,771.90 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,405.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,756.80 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,424.20 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,771.90 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,405.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,981.10 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,993.70 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,484.80 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £9,139.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,017.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,303.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,874.20 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £660.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,955.30 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,771.90 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,993.70 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,484.80 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,756.80 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,543.80 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,650.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,424.20 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,540.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,113.70 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,993.70 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,046.50 |
| March 18 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.40 |
| March 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| March 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,109.67 |
| March 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| March 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| March 24 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £500.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 25 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,993.70 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £-960.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £900.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £1,076.36 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £1,307.14 |
| March 30 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £529.96 |
| March 31 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £850.00 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £100.80 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £731.25 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £190.80 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £536.25 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £111.15 |
| March 2 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £910.00 |
| March 7 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £525.00 |
| March 11 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £2,800.00 |
| March 11 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £2,975.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | BORWICK OUTDOOR EDUCATION | £557.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | HLTA SUPPORT | £750.00 |
| March 21 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £1,247.29 |
| March 29 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £608.75 |
| March 29 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £600.00 |
| March 29 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £204.73 |
| March 29 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £1,300.00 |
| March 23 2011 | CYP - LCC BUDGET - DFM | ADLINGTON CC | £525.00 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £515.45 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,951.80 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,092.28 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,048.03 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,005.46 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,875.10 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,580.15 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,306.60 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £548.53 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £619.70 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £679.28 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.83 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,233.28 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,388.47 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,023.45 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £610.74 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £822.20 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £546.73 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £595.68 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £813.62 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £594.03 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,111.13 |
| March 11 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £737.70 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £802.97 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,458.98 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £597.10 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.35 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £553.84 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £593.30 |
| March 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,810.29 |
| March 28 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,374.70 |
| March 8 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £798.00 |
| March 15 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £507.50 |
| March 21 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £3,950.80 |
| March 1 2011 | CYP - LCC BUDGET - DFM | EYFS CREATIVE DEVELOPMENT | £8,000.00 |
| March 15 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £537.36 |
| March 15 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £-537.36 |
| March 15 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £567.36 |
| March 15 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £-567.36 |
| March 15 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £567.36 |
| March 11 2011 | CYP - LCC BUDGET - DFM | GRADUATE LEADER FUND | £1,250.00 |
| March 11 2011 | CYP - LCC BUDGET - DFM | EY COMMUNITY CHILDMINDING SCHEME | £1,152.00 |
| March 18 2011 | CYP - LCC BUDGET - DFM | ENABLING ENVIRONMENTS | £796.00 |
| March 22 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £1,190.80 |
| March 28 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £600.00 |
| March 28 2011 | CYP - LCC BUDGET - DFM | UNIVERSAL TRAINING | £2,050.00 |
| March 28 2011 | CYP - LCC BUDGET - DFM | UNIVERSAL TRAINING | £2,050.00 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £815.96 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £701.48 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £699.69 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £741.87 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £1,067.30 |
| March 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £548.60 |
| March 10 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £4,500.00 |
| March 15 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £1,224.00 |
| March 4 2011 | CYP - LCC BUDGET - DFM | COMMUNITY COHESION CENTRE | £1,230.69 |
| March 10 2011 | CYP - LCC BUDGET - DFM | 16 ALBERT ROAD COLNE | £1,750.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | NON MAINSTREAM GENERAL | £21,125.00 |
| March 16 2011 | CYP - LCC BUDGET - DFM | NON MAINSTREAM GENERAL | £3,554.75 |
| March 16 2011 | CYP - LCC BUDGET - DFM | OUTDOOR EDUCATION | £562.80 |
| March 22 2011 | CYP - NON SCHOOLS | BALANCE SHEET DEFAULT | £560.40 |
| March 3 2011 | ENVIRONMENT - DFM | PROJECT EAST TEAM | £5,500.00 |
| March 1 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,204.00 |
| March 1 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,684.00 |
| March 1 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,240.00 |
| March 2 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £643.77 |
| March 2 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £543.31 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,470.00 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £595.00 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,000.00 |
| March 4 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £911.54 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,121.00 |
| March 7 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £92.00 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,100.00 |
| March 3 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £45.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £504.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £700.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £840.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £560.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,200.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £924.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £758.80 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £734.40 |
| March 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £630.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £870.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,440.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £840.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £728.00 |
| March 8 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £-179.50 |
| March 8 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £996.08 |
| March 9 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £512.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,035.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £675.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,020.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,020.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,185.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,043.40 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £938.00 |
| March 7 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £900.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £990.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £840.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £950.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £892.50 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £615.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,425.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £960.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £510.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £630.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,478.40 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,875.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £2,025.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,080.00 |
| March 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £735.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £930.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £675.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £504.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £870.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £510.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £825.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £660.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £870.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £540.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £660.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,050.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £654.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,072.50 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £840.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £825.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £700.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £450.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £780.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £900.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £570.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,050.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £700.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,200.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £735.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £420.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,204.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,078.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £658.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £945.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,275.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £675.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,020.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £840.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,125.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,050.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £960.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £570.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,170.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,200.00 |
| March 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £660.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £920.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,140.00 |
| March 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,245.00 |
| March 16 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £800.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £781.00 |
| March 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,066.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,080.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £756.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,008.00 |
| March 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £634.50 |
| March 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,162.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,799.00 |
| March 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £890.00 |
| March 14 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £1,060.00 |
| March 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £546.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £553.50 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £885.00 |
| March 22 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £69.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,478.40 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,080.00 |
| March 18 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £825.00 |
| March 18 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £90.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,158.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,799.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £890.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,008.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £691.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,275.00 |
| March 22 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £870.00 |
| March 30 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £643.77 |
| March 30 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £543.31 |
| March 30 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £816.93 |
| March 30 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £966.00 |
| March 30 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £690.00 |
| March 30 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £598.00 |
| March 3 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,722.00 |
| March 3 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,050.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £252.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £357.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £976.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £525.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £556.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £735.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £2,216.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £840.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,081.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,050.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £556.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £525.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £871.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,218.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £556.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £189.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £346.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £315.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £215.25 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £346.50 |
| March 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| March 10 2011 | ENVIRONMENT - DFM | RISHTON CUNLIFFE QUAR | £1,250.00 |
| March 9 2011 | LCCG - DFM | CATON DEPOT | £808.02 |
| March 15 2011 | PROPERTY GRP - DFM | ISB GENERAL | £443.84 |
| March 15 2011 | PROPERTY GRP - DFM | ISB GENERAL | £586.63 |
| March 15 2011 | PROPERTY GRP - DFM | ISB GENERAL | £421.63 |
| March 25 2011 | PROPERTY GRP - DFM | ISB GENERAL | £1,041.78 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,010.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,206.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £977.46 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,079.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-615.69 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,444.49 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,558.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-745.96 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,096.24 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,647.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,930.76 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,182.88 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,216.72 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £11,766.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,032.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,030.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,269.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-848.16 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,180.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-600.96 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,022.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,205.08 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,459.29 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-301.02 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £786.29 |
| February 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,564.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,311.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,273.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-171.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,068.71 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,282.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,127.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,183.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,744.96 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,542.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,092.92 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,370.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,364.88 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,369.72 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,379.46 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-826.66 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,598.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-431.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,028.71 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,329.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,360.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-404.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,261.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,202.91 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,467.97 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-434.86 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,180.10 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,458.90 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-353.14 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,022.86 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,101.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,119.45 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-756.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,245.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,276.64 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,369.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £996.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.12 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-591.08 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,213.51 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,029.24 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-491.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,246.97 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-548.46 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,249.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,708.84 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,202.91 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,259.65 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,228.53 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,582.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,376.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-244.20 |
| February 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,287.40 |
| February 10 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £996.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,438.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,104.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-833.76 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,192.48 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,160.65 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-387.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-571.76 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,287.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-866.66 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,375.55 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,720.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-355.75 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,245.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,543.12 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,100.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,269.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,465.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,315.92 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-774.08 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,047.21 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,082.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £737.14 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-152.46 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,367.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,343.12 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,320.32 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,196.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,054.32 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-233.00 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,178.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,207.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,273.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-467.61 |
| February 14 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,192.10 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,790.40 |
| February 21 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £39,343.00 |
| February 21 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £5,826.00 |
| February 21 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,012.00 |
| February 22 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,156.00 |
| February 28 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,487.50 |
| February 17 2011 | ACS - REVENUE DFM | SINFONIETTA | £-883.20 |
| February 1 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,161.60 |
| February 1 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £580.80 |
| February 1 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £8,177.60 |
| February 15 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,580.00 |
| February 7 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,472.00 |
| February 7 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,276.00 |
| February 7 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £968.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,106.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,522.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,428.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £10,845.51 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-161.46 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £19,349.48 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,242.29 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,559.68 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,673.56 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,621.96 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £10,508.71 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £22,204.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,752.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,306.41 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-442.85 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-724.88 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,668.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,707.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,024.12 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,271.40 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,044.00 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-284.60 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| February 14 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,271.40 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,930.72 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,232.68 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,930.72 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,930.72 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,106.82 |
| February 8 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,930.72 |
| February 9 2011 | ACS - REVENUE DFM | SINFONIETTA | £682.56 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £3,403.50 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £6,004.80 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £564.00 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,047.70 |
| February 10 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £862.90 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £959.70 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £3,852.00 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,080.10 |
| February 14 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,452.00 |
| February 15 2011 | ACS - REVENUE DFM | HQ GENERAL MISC | £450.00 |
| February 15 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,622.32 |
| February 15 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,622.32 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-83.40 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £956.80 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £616.00 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,548.00 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-25.52 |
| February 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,291.64 |
| February 21 2011 | ACS - REVENUE DFM | SP PROGRAMME - OLDER PEOPLE | £1,724.40 |
| February 25 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,199.16 |
| February 21 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £968.00 |
| February 21 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £867.40 |
| February 21 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,256.00 |
| February 22 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £957.00 |
| February 22 2011 | ACS - REVENUE DFM | TRAINING - ADULT SOCIAL CARE | £1,436.37 |
| February 23 2011 | ACS - REVENUE DFM | LIBRARIES - FRECKLETON | £625.00 |
| February 2 2011 | CORPORATE | HIGHWAYS EL | £6,500.00 |
| February 10 2011 | CORPORATE | DELEGATED SCHOOLS | £690.00 |
| February 14 2011 | CORPORATE | DELEGATED SCHOOLS | £750.00 |
| February 11 2011 | CORPORATE | HIGHWAYS EL | £5,250.00 |
| February 15 2011 | CORPORATE | ADULT SOCIAL SERVICE | £600.00 |
| February 14 2011 | CORPORATE | HIGHWAYS EL | £2,500.00 |
| February 14 2011 | CORPORATE | HIGHWAYS EL | £3,000.00 |
| February 16 2011 | CORPORATE | HIGHWAYS EL | £9,175.00 |
| February 21 2011 | CORPORATE | HIGHWAYS EL | £750.00 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £1,063.05 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £755.33 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £671.40 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £671.40 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £671.40 |
| February 1 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £813.71 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £515.45 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,951.80 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,092.28 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,048.03 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,005.46 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,875.10 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,580.15 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,306.60 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £548.53 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £619.70 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £679.28 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.83 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,233.28 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,388.47 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,023.45 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £610.74 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £822.20 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £546.73 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £595.68 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £813.62 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £594.03 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,111.13 |
| February 11 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £737.70 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £802.97 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,458.98 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £597.10 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.35 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £553.84 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £593.30 |
| February 15 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,810.29 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £727.35 |
| February 28 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £657.50 |
| February 15 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,080.00 |
| February 14 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,083.40 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £514.02 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 2 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,200.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,800.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-5,330.64 |
| February 3 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £1,170.12 |
| February 3 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £2,933.24 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,426.84 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,700.00 |
| February 3 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £55.20 |
| February 3 2011 | CYP - LCC BUDGET - DFM | POULTON CC | £600.00 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £701.48 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £699.69 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £815.96 |
| February 4 2011 | CYP - LCC BUDGET - DFM | BUCKSHAW CC | £1,700.00 |
| February 8 2011 | CYP - LCC BUDGET - DFM | PRESTON EAST CC | £800.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LSCB - TRAINING | £612.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,380.30 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,878.41 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,600.96 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,911.45 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,413.10 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,003.34 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,538.34 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £7,905.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,538.34 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,178.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,043.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,184.75 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £9,444.15 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,217.49 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,153.81 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,795.26 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,600.96 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £9,280.47 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,978.66 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,658.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,317.00 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £12,023.04 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,961.18 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,468.15 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| February 9 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 10 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £682.50 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £741.87 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £548.60 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £1,067.30 |
| February 10 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £960.00 |
| February 10 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,400.00 |
| February 14 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £1,064.58 |
| February 14 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £-1,064.58 |
| February 14 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £206.36 |
| February 14 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £858.22 |
| February 9 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £781.46 |
| February 11 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £1,064.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £740.71 |
| February 11 2011 | CYP - LCC BUDGET - DFM | EY COMMUNITY CHILDMINDING SCHEME | £1,008.00 |
| February 14 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £525.00 |
| February 14 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £590.00 |
| February 14 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,250.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £-1,011.18 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £987.10 |
| February 16 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £500.00 |
| February 10 2011 | CYP - LCC BUDGET - DFM | STAGHILLS CC | £800.00 |
| February 10 2011 | CYP - LCC BUDGET - DFM | STAGHILLS CC | £800.00 |
| February 15 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £2,911.40 |
| February 15 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 15 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,482.40 |
| February 15 2011 | CYP - LCC BUDGET - DFM | EY COMMUNITY CHILDMINDING SCHEME | £1,032.80 |
| February 16 2011 | CYP - LCC BUDGET - DFM | BALLADEN CC | £500.00 |
| February 15 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £6,000.00 |
| February 17 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £662.00 |
| February 18 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £542.64 |
| February 18 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £2,933.24 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-775.68 |
| February 21 2011 | CYP - LCC BUDGET - DFM | MUSIC GENERAL | £632.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,906.17 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,996.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,082.80 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,400.08 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,978.66 |
| February 21 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £740.71 |
| February 17 2011 | CYP - LCC BUDGET - DFM | ADLINGTON CC | £662.50 |
| February 17 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £662.50 |
| February 17 2011 | CYP - LCC BUDGET - DFM | ECCLESTON CC | £700.00 |
| February 22 2011 | CYP - LCC BUDGET - DFM | SEC/POST 16 GROUP GENERAL | £1,050.00 |
| February 22 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £825.44 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £450.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £600.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 23 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 23 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 23 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £450.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,000.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 24 2011 | CYP - LCC BUDGET - DFM | LSCB - TRAINING | £525.70 |
| February 24 2011 | CYP - LCC BUDGET - DFM | POULTON CC | £843.75 |
| February 25 2011 | CYP - LCC BUDGET - DFM | EYFS CREATIVE DEVELOPMENT | £8,400.00 |
| February 24 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| February 24 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,237.50 |
| February 28 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £700.00 |
| February 28 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| February 28 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £650.00 |
| February 28 2011 | CYP - LCC BUDGET - DFM | FIRBANK CC | £725.00 |
| February 28 2011 | CYP - NON SCHOOLS | BALANCE SHEET DEFAULT | £560.42 |
| February 1 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £911.54 |
| February 2 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £-166.00 |
| February 2 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £996.08 |
| February 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £877.50 |
| February 1 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £611.00 |
| February 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £648.00 |
| February 3 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £988.00 |
| February 4 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £637.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £693.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £798.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,071.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £945.00 |
| February 4 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 4 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,207.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,102.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,092.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £724.50 |
| February 8 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,080.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,406.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,380.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £882.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £836.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,160.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £836.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £980.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £855.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,044.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £912.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,064.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £936.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,634.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,160.00 |
| February 9 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,000.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,512.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £267.75 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £735.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £693.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £672.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 9 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,722.00 |
| February 9 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,071.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £819.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,281.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £357.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,260.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £357.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £966.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £588.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £2,079.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £945.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £257.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,417.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £966.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,417.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,869.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,669.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £2,436.00 |
| February 9 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 9 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £861.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £435.75 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £2,569.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £94.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £567.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,585.50 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £567.00 |
| February 11 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £267.75 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,287.00 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £2,375.00 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £2,295.00 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,008.00 |
| February 10 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,162.80 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,178.00 |
| February 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,224.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £720.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £779.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,386.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £456.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £783.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,953.60 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,267.50 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,200.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £500.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,680.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,292.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,130.50 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,440.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £480.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £500.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £972.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,548.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,100.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £760.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £504.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £861.00 |
| February 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £792.00 |
| February 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,440.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,440.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,501.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,216.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £756.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,100.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,748.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,572.50 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £845.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,001.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £987.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,365.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,694.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,660.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £960.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,444.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £900.00 |
| February 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,140.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,197.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £893.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,170.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,386.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,634.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,235.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,080.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £760.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,400.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,330.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,224.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,350.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,008.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,344.00 |
| February 15 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,470.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,600.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £950.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £760.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £900.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,200.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,084.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,206.00 |
| February 16 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £512.00 |
| February 14 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £1,060.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £721.50 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,008.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,260.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £648.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,710.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,362.60 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| February 16 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,092.00 |
| February 16 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £800.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £741.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £620.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £680.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £570.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £637.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £931.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,121.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,197.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,320.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,073.00 |
| February 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £740.00 |
| February 21 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £590.00 |
| February 23 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £2,006.40 |
| February 23 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,026.00 |
| February 23 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £2,276.00 |
| February 23 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,706.40 |
| February 23 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,183.00 |
| February 21 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £791.00 |
| February 21 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £3,984.77 |
| February 23 2011 | ENVIRONMENT - DFM | WASTE TREATMENT | £13.50 |
| February 23 2011 | ENVIRONMENT - DFM | WASTE TREATMENT | £3,800.00 |
| February 28 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £900.00 |
| February 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £940.00 |
| February 2 2011 | PROPERTY GRP - DFM | ISB GENERAL | £544.04 |
| January 4 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 4 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 4 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 4 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 11 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,902.68 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,010.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,206.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,282.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,558.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-745.96 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,251.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £989.95 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,079.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,175.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,972.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,519.94 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,930.76 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,047.78 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,032.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,030.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,269.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-848.16 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,180.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-600.96 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,968.07 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-419.43 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,564.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,311.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,204.96 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-171.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,129.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,542.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,182.88 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,022.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,205.08 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,287.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,183.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,534.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,032.23 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,370.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,364.88 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,182.88 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,216.72 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £13,005.64 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,043.11 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,360.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-404.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,261.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,418.83 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-424.09 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,388.58 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-301.39 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,376.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-244.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,598.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-431.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,558.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £996.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,276.64 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,323.34 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,170.09 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,105.05 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-756.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,039.94 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,013.15 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.12 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-591.08 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,282.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £996.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-86.11 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £497.95 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-43.06 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £162.86 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,046.41 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,337.96 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,051.70 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,309.30 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,438.00 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,287.40 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,375.55 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,720.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-355.75 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,104.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-833.76 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,192.48 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £556.43 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,194.28 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-494.64 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,191.08 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-491.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,249.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,708.84 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,157.26 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-639.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,126.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-571.76 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-716.36 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,416.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-473.96 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £278.21 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,744.94 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-53.82 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,028.71 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,089.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-387.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £947.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,082.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-247.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,178.72 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £903.98 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,543.12 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-193.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,100.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,269.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,612.83 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-424.09 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,174.32 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-774.08 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,250.61 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,271.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,232.75 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,367.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,343.12 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-901.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,320.32 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,196.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-1,018.40 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,054.32 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-233.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,178.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-783.60 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,207.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-391.80 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,273.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-509.20 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,091.44 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,558.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £-478.06 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,948.86 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,433.76 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,113.08 |
| January 13 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,577.52 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £39,343.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £5,826.00 |
| January 17 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,012.00 |
| January 19 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,487.50 |
| January 31 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 27 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,711.40 |
| January 31 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 31 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 31 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,310.80 |
| January 24 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,156.00 |
| January 27 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £3,433.76 |
| January 27 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,902.68 |
| January 27 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £2,113.08 |
| January 27 2011 | ACS - POOLED FUNDING | LD POOLED FUND | £1,577.52 |
| January 7 2011 | ACS - REVENUE DFM | TRAINING - ADULT SOCIAL CARE | £1,428.47 |
| January 7 2011 | ACS - REVENUE DFM | MUSEUMS - SCHOOL MUSEUMS SERVICE | £525.00 |
| January 7 2011 | ACS - REVENUE DFM | MUSEUMS - SCHOOL MUSEUMS SERVICE | £1,075.00 |
| January 5 2011 | ACS - REVENUE DFM | ARTS - PROJECT & DEVELOPMENT GRANTS | £1,800.00 |
| January 7 2011 | ACS - REVENUE DFM | SINFONIETTA | £513.52 |
| January 5 2011 | ACS - REVENUE DFM | SINFONIETTA | £513.52 |
| January 5 2011 | ACS - REVENUE DFM | SINFONIETTA | £1,034.08 |
| January 7 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,716.69 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,106.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,522.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,428.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £7,354.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £10,118.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £21,762.15 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,331.42 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,495.24 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,673.56 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,000.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £27,816.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,440.29 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £498.20 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,094.17 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-75.35 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-64.58 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,668.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,973.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,044.00 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-284.60 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,024.12 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,271.40 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £-391.80 |
| January 17 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,020.29 |
| January 14 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,914.00 |
| January 12 2011 | ACS - REVENUE DFM | LIBRARIES - BURNLEY | £2,500.00 |
| January 14 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £1,922.50 |
| January 12 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,082.40 |
| January 14 2011 | ACS - REVENUE DFM | SINFONIETTA | £651.20 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,642.80 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £1,548.80 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £580.80 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £2,940.50 |
| January 17 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £774.40 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £2,516.80 |
| January 19 2011 | ACS - REVENUE DFM | CORONER - PRESTON & WEST LANCS | £739.00 |
| January 19 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,119.86 |
| January 19 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £5,166.87 |
| January 24 2011 | ACS - REVENUE DFM | SP PROGRAMME - OLDER PEOPLE | £1,293.30 |
| January 20 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £605.00 |
| January 20 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £663.00 |
| January 19 2011 | ACS - REVENUE DFM | MUSEUMS - SCHOOL MUSEUMS SERVICE | £875.00 |
| January 21 2011 | ACS - REVENUE DFM | MUSEUMS - SCHOOL MUSEUMS SERVICE | £1,175.00 |
| January 19 2011 | ACS - REVENUE DFM | OLDER PEOPLE | £2,500.00 |
| January 21 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,342.00 |
| January 21 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,195.72 |
| January 21 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £616.00 |
| January 21 2011 | ACS - REVENUE DFM | MUSEUMS - LANCS MARITIME MUSEUM | £500.00 |
| January 24 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £560.43 |
| January 24 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £3,750.97 |
| January 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £4,823.07 |
| January 26 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £1,012.00 |
| January 27 2011 | ACS - REVENUE DFM | LIBRARIES - FRECKLETON | £191.23 |
| January 27 2011 | ACS - REVENUE DFM | LIBRARIES - FRECKLETON | £481.43 |
| January 28 2011 | ACS - REVENUE DFM | TRAINING - CHILDREN'S SOCIAL CARE | £544.00 |
| January 28 2011 | ACS - REVENUE DFM | PERSONAL SOCIAL CARE | £2,156.00 |
| January 31 2011 | ACS - REVENUE DFM | HQ GENERAL MISC | £450.00 |
| January 31 2011 | ACS - REVENUE DFM | CORONER - BURNLEY | £807.90 |
| January 31 2011 | ACS - REVENUE DFM | SUPPORTED LIVING SCHEME - LANCASTER 1 | £1,392.72 |
| January 31 2011 | ACS - REVENUE DFM | SUPPORTED LIVING SCHEME - LANCASTER 1 | £1,882.72 |
| January 31 2011 | ACS - REVENUE DFM | SUPPORTED LIVING SCHEME - LANCASTER 1 | £1,124.34 |
| January 10 2011 | ACS | BALANCE SHEET DEFAULT | £832.68 |
| January 7 2011 | CAPITAL - CYP NON SHOOLS | CLEO-SME | £1,400.00 |
| January 7 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £500.00 |
| January 7 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £24,200.00 |
| January 7 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £500.00 |
| January 7 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £2,100.00 |
| January 11 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £10,150.00 |
| January 21 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £656.00 |
| January 26 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £6,400.00 |
| January 27 2011 | CAPITAL - ENVIRONMENT | CARRIAGEWAY - PUBLIC REALM SOUTH | £10,000.00 |
| January 10 2011 | CORPORATE | HIGHWAYS EL | £-3,000.00 |
| January 10 2011 | CORPORATE | HIGHWAYS EL | £-2,000.00 |
| January 4 2011 | CORPORATE | DELEGATED SCHOOLS | £1,750.00 |
| January 4 2011 | CORPORATE | HIGHWAYS EL | £1,500.00 |
| January 4 2011 | CORPORATE | HIGHWAYS EL | £2,000.00 |
| January 6 2011 | CORPORATE | HIGHWAYS EL | £2,125.00 |
| January 7 2011 | CORPORATE | HIGHWAYS EL | £600.00 |
| January 10 2011 | CORPORATE | HIGHWAYS EL | £7,500.00 |
| January 13 2011 | CORPORATE | HIGHWAYS EL | £450.00 |
| January 11 2011 | CORPORATE | HIGHWAYS EL | £1,350.00 |
| January 12 2011 | CORPORATE | HIGHWAYS EL | £950.00 |
| January 13 2011 | CORPORATE | HIGHWAYS EL | £485.00 |
| January 12 2011 | CORPORATE | OCE | £1,000.00 |
| January 12 2011 | CORPORATE | CHILDRENS SOCIAL CARE | £1,785.00 |
| January 13 2011 | CORPORATE | HIGHWAYS EL | £1,500.00 |
| January 13 2011 | CORPORATE | HIGHWAYS EL | £4,500.00 |
| January 14 2011 | CORPORATE | HIGHWAYS EL | £2,500.00 |
| January 14 2011 | CORPORATE | LCES | £43,295.05 |
| January 18 2011 | CORPORATE | HIGHWAYS EL | £2,750.00 |
| January 18 2011 | CORPORATE | HIGHWAYS EL | £10,000.00 |
| January 19 2011 | CORPORATE | DELEGATED SCHOOLS | £1,250.00 |
| January 19 2011 | CORPORATE | HIGHWAYS EL | £4,500.00 |
| January 19 2011 | CORPORATE | DELEGATED SCHOOLS | £690.00 |
| January 21 2011 | CORPORATE | BALANCE SHEET DEFAULT | £608.00 |
| January 20 2011 | CORPORATE | HIGHWAYS EL | £2,210.00 |
| January 20 2011 | CORPORATE | DELEGATED SCHOOLS | £2,585.00 |
| January 20 2011 | CORPORATE | HIGHWAYS EL | £1,600.00 |
| January 20 2011 | CORPORATE | HIGHWAYS EL | £1,500.00 |
| January 24 2011 | CORPORATE | HIGHWAYS EL | £3,650.00 |
| January 24 2011 | CORPORATE | OCE | £8,500.00 |
| January 25 2011 | CORPORATE | HIGHWAYS EL | £800.00 |
| January 25 2011 | CORPORATE | HIGHWAYS EL | £9,150.00 |
| January 25 2011 | CORPORATE | HIGHWAYS EL | £2,500.00 |
| January 28 2011 | CORPORATE | HIGHWAYS EL | £690.00 |
| January 28 2011 | CORPORATE | HIGHWAYS EL | £450.00 |
| January 27 2011 | CORPORATE | HIGHWAYS EL | £460.00 |
| January 27 2011 | CORPORATE | DELEGATED SCHOOLS | £850.00 |
| January 27 2011 | CORPORATE | DELEGATED SCHOOLS | £3,100.00 |
| January 27 2011 | CORPORATE | HIGHWAYS EL | £2,505.78 |
| January 27 2011 | CORPORATE | HIGHWAYS EL | £2,500.00 |
| January 28 2011 | CORPORATE | HIGHWAYS EL | £37,000.00 |
| January 31 2011 | CORPORATE | HIGHWAYS EL | £2,000.00 |
| January 31 2011 | CORPORATE | HIGHWAYS EL | £1,500.00 |
| January 7 2011 | CORPORATE - DFM | GENERAL | £19,950.00 |
| January 19 2011 | CORPORATE - DFM | SCHOOLS APPEALS MEMBERS | £625.46 |
| January 19 2011 | CORPORATE - DFM | SCHOOLS APPEALS MEMBERS | £7.00 |
| January 19 2011 | CORPORATE - DFM | SCHOOLS APPEALS MEMBERS | £44.00 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £939.96 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £732.95 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £537.12 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £537.12 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £515.45 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,951.80 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,092.28 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,048.03 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,005.46 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,875.10 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,580.15 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,306.60 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £548.53 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £619.70 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £679.28 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.83 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,233.28 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,388.47 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,023.45 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £610.74 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £822.20 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £546.73 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £595.68 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £813.62 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £594.03 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,111.13 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £737.70 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £802.97 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,458.98 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £597.10 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.35 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £553.84 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £593.30 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,810.29 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £581.88 |
| January 31 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £526.00 |
| January 4 2011 | CYP - LCC BUDGET - DFM | COMMUNITY COHESION CENTRE | £1,230.69 |
| January 5 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £600.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £30.80 |
| January 5 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £-600.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £459.20 |
| January 5 2011 | CYP - LCC BUDGET - DFM | WDQA TEAM GENERAL | £140.80 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 6 2011 | CYP - LCC BUDGET - DFM | FYLDEFOSTERING LCC | £988.00 |
| January 4 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £1,400.00 |
| January 6 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £55.20 |
| January 6 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £9,444.15 |
| January 6 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| January 6 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,600.96 |
| January 6 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,109.67 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £815.96 |
| January 7 2011 | CYP - LCC BUDGET - DFM | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £684.00 |
| January 5 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £2,100.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £699.69 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £701.48 |
| January 6 2011 | CYP - LCC BUDGET - DFM | LANCS SCH DANCE FESTIVAL | £750.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £741.87 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £548.60 |
| January 12 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £1,067.30 |
| January 10 2011 | CYP - LCC BUDGET - DFM | PRESTON EAST CC | £600.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £1,562.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £524.70 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £380.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £285.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £40.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £40.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £40.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £40.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | WHITEHOUGH OUTDOOR EDUCATION CENTRE | £95.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,350.00 |
| January 13 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,195.71 |
| January 7 2011 | CYP - LCC BUDGET - DFM | IS & P TEAM GENERAL | £4,613.60 |
| January 7 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £700.00 |
| January 7 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £585.51 |
| January 7 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £500.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,200.00 |
| January 11 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,225.00 |
| January 7 2011 | CYP - LCC BUDGET - DFM | FIRBANK CC | £575.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,315.76 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,600.96 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,555.52 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,148.05 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,040.88 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,239.68 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,252.48 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,794.12 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,195.92 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £10,859.52 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £5,330.64 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,239.68 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,520.44 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,234.10 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,374.35 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,394.70 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,374.35 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,394.70 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,148.05 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-1,818.32 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,093.49 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-1,696.43 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,093.49 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-1,696.43 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-3,100.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-1,700.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,239.68 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,794.12 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £7,239.68 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £5,558.28 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,195.92 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,577.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £5,842.20 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,893.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,794.12 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,382.36 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,178.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £7,140.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,178.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,956.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,503.08 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £8,530.20 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,252.48 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,683.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,520.44 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,800.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,615.92 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £2,843.40 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,520.44 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,619.84 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,047.80 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £-2,234.10 |
| January 10 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £6,300.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | EY COMMUNITY CHILDMINDING SCHEME | £926.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 13 2011 | CYP - LCC BUDGET - DFM | NON MAINSTREAM GENERAL | £1,000.00 |
| January 14 2011 | CYP - LCC BUDGET - DFM | CHILDREN WITH DISABILITIES | £6,242.60 |
| January 24 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £3,500.00 |
| January 24 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £-3,500.00 |
| January 24 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £1,400.00 |
| January 24 2011 | CYP - LCC BUDGET - DFM | CMS GROUP GENERAL | £2,100.00 |
| January 12 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £600.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £-560.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £520.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £610.00 |
| January 14 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £2,500.00 |
| January 18 2011 | CYP - LCC BUDGET - DFM | IS & P TEAM GENERAL | £600.19 |
| January 18 2011 | CYP - LCC BUDGET - DFM | IS & P TEAM GENERAL | £600.19 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £125.10 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £1,040.00 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £46.55 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £852.50 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £852.50 |
| January 28 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £917.50 |
| January 17 2011 | CYP - LCC BUDGET - DFM | ADOPTION SERVICE MANAGEMENT | £6,000.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,000.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £3,500.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £550.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £600.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £650.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,250.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,109.67 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £650.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £600.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,265.50 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,538.34 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,317.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,413.10 |
| January 17 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £825.00 |
| January 17 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £1,200.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | RIBBLETON CC | £640.00 |
| January 20 2011 | CYP - LCC BUDGET - DFM | MUSIC GENERAL | £882.40 |
| January 20 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £34.50 |
| January 20 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £69.00 |
| January 18 2011 | CYP - LCC BUDGET - DFM | NON MAINSTREAM GENERAL | £500.00 |
| January 18 2011 | CYP - LCC BUDGET - DFM | THORNTON (PRIMARY) CC | £1,080.00 |
| January 21 2011 | CYP - LCC BUDGET - DFM | SPECIAL EDUCATIONAL NEEDS | £480.00 |
| January 21 2011 | CYP - LCC BUDGET - DFM | HEALTH EQAULITY AND INCLUSION TEAM | £13,000.00 |
| January 21 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £1,000.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| January 19 2011 | CYP - LCC BUDGET - DFM | DISTRICT BASE KIRKHAM | £600.00 |
| January 20 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £507.60 |
| January 20 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £664.77 |
| January 24 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £3,572.70 |
| January 20 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £750.00 |
| January 24 2011 | CYP - LCC BUDGET - DFM | NON MAINSTREAM GENERAL | £914.74 |
| January 24 2011 | CYP - LCC BUDGET - DFM | PRESTON EAST CC | £800.00 |
| January 20 2011 | CYP - LCC BUDGET - DFM | COPPERHOUSE CC | £2,000.00 |
| January 20 2011 | CYP - LCC BUDGET - DFM | COPPERHOUSE CC | £1,000.00 |
| January 20 2011 | CYP - LCC BUDGET - DFM | COPPERHOUSE CC | £2,000.00 |
| January 25 2011 | CYP - LCC BUDGET - DFM | BUSINESS SUPPORT TO PROVIDERS TEAM | £1,089.50 |
| January 21 2011 | CYP - LCC BUDGET - DFM | STAGHILLS CC | £800.00 |
| January 26 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £4,109.67 |
| January 24 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £746.35 |
| January 26 2011 | CYP - LCC BUDGET - DFM | QUALITY ASSURANCE | £521.45 |
| January 26 2011 | CYP - LCC BUDGET - DFM | EY COMMUNITY CHILDMINDING SCHEME | £935.00 |
| January 26 2011 | CYP - LCC BUDGET - DFM | FOSTERING | £1,176.43 |
| January 26 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £181.80 |
| January 26 2011 | CYP - LCC BUDGET - DFM | GRADUATE TEACHER PROGRAMME | £1,105.00 |
| January 25 2011 | CYP - LCC BUDGET - DFM | COURSES FOR YOUNG PEOPLE | £500.00 |
| January 28 2011 | CYP - LCC BUDGET - DFM | LAA LSES SEC STRT NUM | £2,000.14 |
| January 28 2011 | CYP - LCC BUDGET - DFM | LOCALITY MANAGEMENT TEAM | £1,928.60 |
| January 26 2011 | CYP - LCC BUDGET - DFM | UPHOLLAND CHILDRENS CENTRE | £750.00 |
| January 26 2011 | CYP - LCC BUDGET - DFM | CHILDRENS WORKFORCE DEVELOPMENT (UPS) | £600.00 |
| January 28 2011 | CYP - LCC BUDGET - DFM | LANCASHIRE STUDENT SERVICES | £1,000.00 |
| January 27 2011 | CYP - LCC BUDGET - DFM | HOME TO SCHOOL TRANSPORT SERVICE | £594.34 |
| January 28 2011 | CYP - LCC BUDGET - DFM | BUSINESS SERVICES TEAM | £40,000.00 |
| January 28 2011 | CYP - LCC BUDGET - DFM | ECCLESTON CC | £500.00 |
| January 28 2011 | CYP - LCC BUDGET - DFM | ECCLESTON CC | £700.00 |
| January 31 2011 | CYP - LCC BUDGET - DFM | ADLINGTON CC | £737.50 |
| January 25 2011 | CYP - NON SCHOOLS | BALANCE SHEET DEFAULT | £560.42 |
| January 13 2011 | ENVIRONMENT | BALANCE SHEET DEFAULT | £4,500.00 |
| January 4 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,020.00 |
| January 4 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £880.00 |
| January 4 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,462.00 |
| January 5 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £543.31 |
| January 6 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,634.00 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £16.04 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £39.00 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £33.40 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £18.75 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £106.00 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £115.00 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £89.19 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £4.50 |
| January 6 2011 | ENVIRONMENT - DFM | HEALTH & SAFETY | £13.50 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £45.00 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £45.00 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £30.00 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £230.00 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £17.50 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £17.50 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £230.00 |
| January 11 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £230.00 |
| January 11 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,672.00 |
| January 7 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £3.40 |
| January 7 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £164.44 |
| January 7 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £14.27 |
| January 12 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,530.00 |
| January 13 2011 | ENVIRONMENT - DFM | PROW WEST LANCS NON-SPECIFIC | £17.50 |
| January 13 2011 | ENVIRONMENT - DFM | HIGHWAY LIGHTING - PUBLIC REALM SOUTH | £600.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £567.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £42.00 |
| January 12 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £643.77 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £766.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £131.25 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £903.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £735.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £924.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £365.50 |
| January 10 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £945.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £588.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £724.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £798.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £252.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £262.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £588.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £672.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £672.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £378.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £672.00 |
| January 10 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| January 10 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £126.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £724.50 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £42.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £714.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| January 12 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £840.00 |
| January 10 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £877.00 |
| January 11 2011 | ENVIRONMENT - DFM | MISCELLANEOUS | £3,457.47 |
| January 11 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £791.00 |
| January 11 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £3,984.77 |
| January 13 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £-171.50 |
| January 13 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £996.08 |
| January 13 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £911.54 |
| January 11 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £68.97 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £884.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £572.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £572.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £520.00 |
| January 12 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £795.60 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £680.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £702.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,430.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £715.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £624.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £520.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,118.00 |
| January 14 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £728.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,118.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £494.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £585.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £780.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £494.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £500.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £504.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £650.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £676.00 |
| January 17 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £562.50 |
| January 13 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £611.00 |
| January 18 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £754.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £520.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £676.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £754.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £637.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £806.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £806.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £767.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £780.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £667.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £858.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,625.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,196.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,620.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £520.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £500.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £806.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £585.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £715.00 |
| January 18 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £845.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £936.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £975.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £500.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £728.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £858.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £624.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £884.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £684.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £773.50 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,152.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £910.00 |
| January 20 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £600.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £507.00 |
| January 19 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £780.00 |
| January 19 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £715.00 |
| January 19 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £901.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £300.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £650.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £728.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £845.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £756.00 |
| January 21 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £962.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £832.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £730.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,079.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £912.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £637.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £767.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £754.00 |
| January 25 2011 | ENVIRONMENT - DFM | ADULTS OPERATIONAL | £840.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £987.50 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £902.40 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £705.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £960.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £897.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £715.00 |
| January 25 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £156.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £693.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £624.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £702.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,089.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,276.00 |
| January 24 2011 | ENVIRONMENT - DFM | RISHTON CUNLIFFE QUAR | £2,300.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £800.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,330.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,100.00 |
| January 24 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £572.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £928.20 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £520.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £929.50 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £748.00 |
| January 27 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £543.31 |
| January 28 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £546.00 |
| January 28 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £1,040.00 |
| January 26 2011 | ENVIRONMENT - DFM | SEN OPERATIONAL | £637.00 |
| January 26 2011 | ENVIRONMENT - DFM | CARRIAGEWAY - PUBLIC REALM SOUTH | £43.49 |
| January 31 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £643.77 |
| January 28 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £736.00 |
| January 28 2011 | ENVIRONMENT - DFM | ROAD SAFETY EDUCATION & TRAINING COURSES | £736.00 |
| January 28 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £791.00 |
| January 28 2011 | ENVIRONMENT - DFM | SCHOOL TRANSPORT OPERATIONAL | £3,984.77 |
| January 4 2011 | PROPERTY GRP - DFM | ISB GENERAL | £528.94 |
| January 4 2011 | PROPERTY GRP - DFM | ISB GENERAL | £2,890.54 |
| January 4 2011 | PROPERTY GRP - DFM | ISB GENERAL | £522.18 |
| December 6 2010 | not provided | LD POOLED FUND | £3,310.80 |
| December 6 2010 | not provided | LD POOLED FUND | £3,310.80 |
| December 6 2010 | not provided | LD POOLED FUND | £3,310.80 |
| December 6 2010 | not provided | LD POOLED FUND | £3,310.80 |
| December 7 2010 | not provided | LD POOLED FUND | £3,904.80 |
| December 8 2010 | not provided | LD POOLED FUND | £1,577.52 |
| December 8 2010 | not provided | LD POOLED FUND | £1,902.68 |
| December 8 2010 | not provided | LD POOLED FUND | £2,113.08 |
| December 8 2010 | not provided | LD POOLED FUND | £3,433.76 |
| December 16 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 16 2010 | not provided | LD POOLED FUND | £1,287.40 |
| December 16 2010 | not provided | LD POOLED FUND | £2,564.00 |
| December 17 2010 | not provided | LD POOLED FUND | £3,012.00 |
| December 17 2010 | not provided | LD POOLED FUND | £5,826.00 |
| December 17 2010 | not provided | LD POOLED FUND | £39,343.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,183.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,175.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,040.94 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,030.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,018.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-1,018.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-901.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-901.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-901.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-901.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-901.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-869.72 |
| December 20 2010 | not provided | LD POOLED FUND | £-848.16 |
| December 20 2010 | not provided | LD POOLED FUND | £-833.76 |
| December 20 2010 | not provided | LD POOLED FUND | £-806.76 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-783.60 |
| December 20 2010 | not provided | LD POOLED FUND | £-774.08 |
| December 20 2010 | not provided | LD POOLED FUND | £-756.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-745.96 |
| December 20 2010 | not provided | LD POOLED FUND | £-716.36 |
| December 20 2010 | not provided | LD POOLED FUND | £-716.36 |
| December 20 2010 | not provided | LD POOLED FUND | £-639.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-639.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-639.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-639.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-600.96 |
| December 20 2010 | not provided | LD POOLED FUND | £-596.32 |
| December 20 2010 | not provided | LD POOLED FUND | £-591.08 |
| December 20 2010 | not provided | LD POOLED FUND | £-571.76 |
| December 20 2010 | not provided | LD POOLED FUND | £-517.01 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-509.19 |
| December 20 2010 | not provided | LD POOLED FUND | £-494.64 |
| December 20 2010 | not provided | LD POOLED FUND | £-491.44 |
| December 20 2010 | not provided | LD POOLED FUND | £-462.64 |
| December 20 2010 | not provided | LD POOLED FUND | £-456.38 |
| December 20 2010 | not provided | LD POOLED FUND | £-430.19 |
| December 20 2010 | not provided | LD POOLED FUND | £-404.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-391.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-387.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-247.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-247.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-247.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-247.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-244.20 |
| December 20 2010 | not provided | LD POOLED FUND | £-233.00 |
| December 20 2010 | not provided | LD POOLED FUND | £-196.12 |
| December 20 2010 | not provided | LD POOLED FUND | £-193.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-193.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-171.40 |
| December 20 2010 | not provided | LD POOLED FUND | £-107.64 |
| December 20 2010 | not provided | LD POOLED FUND | £-64.58 |
| December 20 2010 | not provided | LD POOLED FUND | £480.65 |
| December 20 2010 | not provided | LD POOLED FUND | £500.79 |
| December 20 2010 | not provided | LD POOLED FUND | £556.43 |
| December 20 2010 | not provided | LD POOLED FUND | £882.00 |
| December 20 2010 | not provided | LD POOLED FUND | £916.74 |
| December 20 2010 | not provided | LD POOLED FUND | £996.00 |
| December 20 2010 | not provided | LD POOLED FUND | £996.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,024.72 |
| December 20 2010 | not provided | LD POOLED FUND | £1,035.56 |
| December 20 2010 | not provided | LD POOLED FUND | £1,065.95 |
| December 20 2010 | not provided | LD POOLED FUND | £1,079.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,081.14 |
| December 20 2010 | not provided | LD POOLED FUND | £1,082.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,089.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,091.44 |
| December 20 2010 | not provided | LD POOLED FUND | £1,091.44 |
| December 20 2010 | not provided | LD POOLED FUND | £1,091.44 |
| December 20 2010 | not provided | LD POOLED FUND | £1,092.92 |
| December 20 2010 | not provided | LD POOLED FUND | £1,100.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,109.17 |
| December 20 2010 | not provided | LD POOLED FUND | £1,111.60 |
| December 20 2010 | not provided | LD POOLED FUND | £1,127.60 |
| December 20 2010 | not provided | LD POOLED FUND | £1,171.87 |
| December 20 2010 | not provided | LD POOLED FUND | £1,180.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,182.12 |
| December 20 2010 | not provided | LD POOLED FUND | £1,182.13 |
| December 20 2010 | not provided | LD POOLED FUND | £1,182.37 |
| December 20 2010 | not provided | LD POOLED FUND | £1,191.08 |
| December 20 2010 | not provided | LD POOLED FUND | £1,194.28 |
| December 20 2010 | not provided | LD POOLED FUND | £1,207.80 |
| December 20 2010 | not provided | LD POOLED FUND | £1,218.75 |
| December 20 2010 | not provided | LD POOLED FUND | £1,245.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,249.80 |
| December 20 2010 | not provided | LD POOLED FUND | £1,251.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,261.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,269.80 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.12 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,271.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,273.44 |
| December 20 2010 | not provided | LD POOLED FUND | £1,273.44 |
| December 20 2010 | not provided | LD POOLED FUND | £1,276.64 |
| December 20 2010 | not provided | LD POOLED FUND | £1,280.24 |
| December 20 2010 | not provided | LD POOLED FUND | £1,282.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,311.40 |
| December 20 2010 | not provided | LD POOLED FUND | £1,317.30 |
| December 20 2010 | not provided | LD POOLED FUND | £1,355.32 |
| December 20 2010 | not provided | LD POOLED FUND | £1,376.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,416.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,416.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,558.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,580.83 |
| December 20 2010 | not provided | LD POOLED FUND | £1,598.00 |
| December 20 2010 | not provided | LD POOLED FUND | £1,616.32 |
| December 20 2010 | not provided | LD POOLED FUND | £1,708.84 |
| December 20 2010 | not provided | LD POOLED FUND | £1,712.14 |
| December 20 2010 | not provided | LD POOLED FUND | £1,733.78 |
| December 20 2010 | not provided | LD POOLED FUND | £1,739.69 |
| December 20 2010 | not provided | LD POOLED FUND | £1,908.50 |
| December 20 2010 | not provided | LD POOLED FUND | £2,047.78 |
| December 20 2010 | not provided | LD POOLED FUND | £2,102.60 |
| December 20 2010 | not provided | LD POOLED FUND | £2,104.00 |
| December 20 2010 | not provided | LD POOLED FUND | £2,113.81 |
| December 20 2010 | not provided | LD POOLED FUND | £2,115.58 |
| December 20 2010 | not provided | LD POOLED FUND | £2,126.80 |
| December 20 2010 | not provided | LD POOLED FUND | £2,126.80 |
| December 20 2010 | not provided | LD POOLED FUND | £2,178.80 |
| December 20 2010 | not provided | LD POOLED FUND | £2,182.88 |
| December 20 2010 | not provided | LD POOLED FUND | £2,192.48 |
| December 20 2010 | not provided | LD POOLED FUND | £2,269.40 |
| December 20 2010 | not provided | LD POOLED FUND | £2,272.07 |
| December 20 2010 | not provided | LD POOLED FUND | £2,278.78 |
| December 20 2010 | not provided | LD POOLED FUND | £2,279.89 |
| December 20 2010 | not provided | LD POOLED FUND | £2,292.28 |
| December 20 2010 | not provided | LD POOLED FUND | £2,315.92 |
| December 20 2010 | not provided | LD POOLED FUND | £2,320.32 |
| December 20 2010 | not provided | LD POOLED FUND | £2,364.88 |
| December 20 2010 | not provided | LD POOLED FUND | £2,514.88 |
| December 20 2010 | not provided | LD POOLED FUND | £2,528.80 |
| December 20 2010 | not provided | LD POOLED FUND | £2,542.80 |
| December 20 2010 | not provided | LD POOLED FUND | £2,595.14 |
| December 20 2010 | not provided | LD POOLED FUND | £2,647.40 |
| December 20 2010 | not provided | LD POOLED FUND | £2,760.26 |
| December 20 2010 | not provided | LD POOLED FUND | £2,920.03 |
| December 20 2010 | not provided | LD POOLED FUND | £2,971.78 |
| December 20 2010 | not provided | LD POOLED FUND | £2,972.20 |
| December 20 2010 | not provided | LD POOLED FUND | £2,982.46 |
| December 20 2010 | not provided | LD POOLED FUND | £3,032.20 |
| December 20 2010 | not provided | LD POOLED FUND | £3,196.00 |
| December 20 2010 | not provided | LD POOLED FUND | £3,306.16 |
| December 20 2010 | not provided | LD POOLED FUND | £3,534.80 |
| December 20 2010 | not provided | LD POOLED FUND | £-86.11 |
| December 20 2010 | not provided | LD POOLED FUND | £-75.35 |
| December 20 2010 | not provided | LD POOLED FUND | £-32.29 |
| December 20 2010 | not provided | LD POOLED FUND | £-32.29 |
| December 20 2010 | not provided | LD POOLED FUND | £-32.29 |
| December 20 2010 | not provided | LD POOLED FUND | £-21.53 |
| December 20 2010 | not provided | LD POOLED FUND | £98.29 |
| December 20 2010 | not provided | LD POOLED FUND | £147.43 |
| December 20 2010 | not provided | LD POOLED FUND | £147.43 |
| December 20 2010 | not provided | LD POOLED FUND | £149.87 |
| December 20 2010 | not provided | LD POOLED FUND | £344.00 |
| December 20 2010 | not provided | LD POOLED FUND | £445.14 |
| December 20 2010 | not provided | LD POOLED FUND | £1,502.29 |
| December 20 2010 | not provided | LD POOLED FUND | £2,010.00 |
| December 20 2010 | not provided | LD POOLED FUND | £2,206.00 |
| December 20 2010 | not provided | LD POOLED FUND | £2,370.00 |
| December 20 2010 | not provided | LD POOLED FUND | £3,022.00 |
| December 20 2010 | not provided | LD POOLED FUND | £11,376.00 |
| December 21 2010 | not provided | LD POOLED FUND | £3,156.00 |
| December 31 2010 | not provided | LD POOLED FUND | £3,487.50 |
| December 1 2010 | not provided | CORONER - PRESTON & WEST LANCS | £512.80 |
| December 2 2010 | not provided | MH DAY - HYNDBURN DCMI | £1,097.95 |
| December 3 2010 | not provided | SINFONIETTA | £1,237.50 |
| December 3 2010 | not provided | SINFONIETTA | £501.61 |
| December 3 2010 | not provided | SINFONIETTA | £571.81 |
| December 6 2010 | not provided | PERSONAL SOCIAL CARE | £747.08 |
| December 7 2010 | not provided | SINFONIETTA | £883.20 |
| December 8 2010 | not provided | PERSONAL SOCIAL CARE | £832.68 |
| December 8 2010 | not provided | PERSONAL SOCIAL CARE | £832.68 |
| December 8 2010 | not provided | PERSONAL SOCIAL CARE | £1,816.00 |
| December 8 2010 | not provided | CORONER - PRESTON & WEST LANCS | £677.60 |
| December 8 2010 | not provided | CORONER - PRESTON & WEST LANCS | £774.40 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £661.00 |
| December 10 2010 | not provided | CORONER - BURNLEY | £677.60 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £959.70 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £1,233.05 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £1,236.70 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £1,355.20 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £2,316.90 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £2,586.60 |
| December 10 2010 | not provided | CORONER - PRESTON & WEST LANCS | £3,368.00 |
| December 10 2010 | not provided | ARTS - CULTURAL OLYMPIAD/BLAZE | £500.00 |
| December 13 2010 | not provided | PERSONAL SOCIAL CARE | £511.38 |
| December 13 2010 | not provided | CORONER - BURNLEY | £595.90 |
| December 13 2010 | not provided | CORONER - BURNLEY | £595.90 |
| December 16 2010 | not provided | PERSONAL SOCIAL CARE | £2,414.50 |
| December 16 2010 | not provided | HQ GENERAL MISC | £850.00 |
| December 17 2010 | not provided | SINFONIETTA | £883.20 |
| December 17 2010 | not provided | SINFONIETTA | £1,137.60 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-391.80 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-391.80 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,271.40 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,271.40 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-284.60 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-64.59 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-32.29 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,461.20 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £2,024.12 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £6,678.20 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £485.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,044.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,368.45 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,428.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,522.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £1,673.56 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £2,000.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £2,668.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £2,700.29 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £3,106.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £7,354.00 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £20,784.62 |
| December 20 2010 | not provided | PERSONAL SOCIAL CARE | £-7,210.01 |
| December 22 2010 | not provided | PERSONAL SOCIAL CARE | £5,618.22 |
| December 22 2010 | not provided | PERSONAL SOCIAL CARE | £803.00 |
| December 23 2010 | not provided | MUSEUMS - SCHOOL MUSEUMS SERVICE | £525.00 |
| December 23 2010 | not provided | MUSEUMS - SCHOOL MUSEUMS SERVICE | £700.00 |
| December 23 2010 | not provided | PERSONAL SOCIAL CARE | £832.68 |
| December 23 2010 | not provided | ADMINISTRATION - CHORLEY | £12,750.00 |
| December 23 2010 | not provided | SP PROGRAMME - OLDER PEOPLE | £1,724.40 |
| December 30 2010 | not provided | PERSONAL SOCIAL CARE | £898.16 |
| December 30 2010 | not provided | ARTS - REMADE | £600.00 |
| December 31 2010 | not provided | CORONER - BURNLEY | £1,385.50 |
| December 31 2010 | not provided | SINFONIETTA | £1,112.60 |
| December 14 2010 | not provided | HUNCOAT WTS | £619.43 |
| December 22 2010 | not provided | CARRIAGEWAY - PUBLIC REALM SOUTH | £20,000.00 |
| December 8 2010 | not provided | HIGHWAYS EL | £2,500.00 |
| December 8 2010 | not provided | CARE SERV | £8,000.00 |
| December 9 2010 | not provided | HIGHWAYS EL | £3,000.00 |
| December 10 2010 | not provided | HIGHWAYS EL | £1,000.00 |
| December 10 2010 | not provided | HIGHWAYS EL | £1,178.17 |
| December 13 2010 | not provided | HIGHWAYS EL | £3,000.00 |
| December 13 2010 | not provided | HIGHWAYS EL | £600.00 |
| December 16 2010 | not provided | HIGHWAYS EL | £3,300.00 |
| December 16 2010 | not provided | HIGHWAYS EL | £4,000.00 |
| December 20 2010 | not provided | HIGHWAYS EL | £1,384.20 |
| December 20 2010 | not provided | HIGHWAYS EL | £2,000.00 |
| December 20 2010 | not provided | HIGHWAYS EL | £2,000.00 |
| December 20 2010 | not provided | HIGHWAYS EL | £2,000.00 |
| December 21 2010 | not provided | CLEANING | £700.00 |
| December 23 2010 | not provided | ADULT SOCIAL SERVICE | £3,439.00 |
| December 30 2010 | not provided | HIGHWAYS EL | £470.00 |
| December 30 2010 | not provided | HIGHWAYS EL | £750.00 |
| December 31 2010 | not provided | HIGHWAYS EL | £1,800.00 |
| December 31 2010 | not provided | HIGHWAYS EL | £2,500.00 |
| December 31 2010 | not provided | CARE SERV | £3,350.00 |
| December 15 2010 | not provided | MISCELLANEOUS EXPENDITURE | £887.76 |
| December 17 2010 | not provided | EPR MATRIX PAYMENTS | £8,753.42 |
| December 31 2010 | not provided | MISCELLANEOUS EXPENDITURE | £1,285.28 |
| December 1 2010 | not provided | FOSTERING | £813.71 |
| December 1 2010 | not provided | STAGHILLS CC | £790.00 |
| December 1 2010 | not provided | IS & P TEAM GENERAL | £509.25 |
| December 1 2010 | not provided | HOME TO SCHOOL TRANSPORT SERVICE | £614.04 |
| December 1 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £6,300.00 |
| December 2 2010 | not provided | POULTON CC | £900.00 |
| December 2 2010 | not provided | 16 ALBERT ROAD COLNE | £600.00 |
| December 2 2010 | not provided | 16 ALBERT ROAD COLNE | £1,750.00 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £526.00 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £537.12 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £537.12 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £581.88 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £861.63 |
| December 6 2010 | not provided | CHILDREN WITH DISABILITIES | £1,029.48 |
| December 6 2010 | not provided | FOSTERING | £840.00 |
| December 7 2010 | not provided | CMS GROUP GENERAL | £5,600.00 |
| December 7 2010 | not provided | BACUP-KINGS ST CENTRE | £1,500.00 |
| December 8 2010 | not provided | FOSTERING | £502.69 |
| December 8 2010 | not provided | FOSTERING | £616.26 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | FOSTERING | £610.00 |
| December 8 2010 | not provided | RIBBLETON CC | £1,575.00 |
| December 8 2010 | not provided | ORMSKIRK INFO CTR/MUSIC STD | £4,077.75 |
| December 9 2010 | not provided | LOCALITY MANAGEMENT TEAM | £1,433.64 |
| December 9 2010 | not provided | LOCALITY MANAGEMENT TEAM | £1,581.22 |
| December 9 2010 | not provided | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £912.00 |
| December 9 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 9 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £1,975.50 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £548.60 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £699.69 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £701.48 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £741.87 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £815.96 |
| December 10 2010 | not provided | ADOPTION SERVICE MANAGEMENT | £1,067.30 |
| December 10 2010 | not provided | SEC/POST 16 GROUP GENERAL | £2,625.00 |
| December 10 2010 | not provided | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £819.00 |
| December 10 2010 | not provided | CLAYTON BROOK CC | £1,800.00 |
| December 13 2010 | not provided | CMS GROUP GENERAL | £3,500.00 |
| December 13 2010 | not provided | PROFESSIONAL DEVELOPMENT SERVICE | £850.00 |
| December 13 2010 | not provided | EY COMMUNITY CHILDMINDING SCHEME | £1,036.60 |
| December 13 2010 | not provided | GRADUATE LEADER FUND | £1,250.00 |
| December 13 2010 | not provided | PRESTON EAST CC | £800.00 |
| December 13 2010 | not provided | PRESTON EAST CC | £1,000.00 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £1,557.73 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 13 2010 | not provided | CHILDREN WITH DISABILITIES | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 13 2010 | not provided | NON MAINSTREAM GENERAL | £1,250.00 |
| December 13 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £737.70 |
| December 14 2010 | not provided | BUSINESS SUPPORT TO PROVIDERS TEAM | £698.50 |
| December 14 2010 | not provided | EYFS OUTDOOR PLAY | £981.20 |
| December 14 2010 | not provided | WDQA TEAM GENERAL | £1,281.50 |
| December 14 2010 | not provided | WDQA TEAM GENERAL | £2,933.24 |
| December 14 2010 | not provided | WDQA TEAM GENERAL | £3,666.55 |
| December 14 2010 | not provided | CLAYTON BROOK CC | £640.00 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-5,901.78 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-1,534.40 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-1,523.04 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-913.95 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-828.00 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-594.58 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-575.40 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,315.76 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,374.35 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,878.41 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,003.34 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.65 |
| December 14 2010 | not provided | CHILDREN WITH DISABILITIES | £4,007.68 |
| December 14 2010 | not provided | CHILDREN WITH DISABILITIES | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 14 2010 | not provided | LOCALITY MANAGEMENT TEAM | £5,184.75 |
| December 14 2010 | not provided | CHILDREN WITH DISABILITIES | £6,911.45 |
| December 15 2010 | not provided | CHILDREN WITH DISABILITIES | £-4,967.97 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,897.63 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 15 2010 | not provided | LOCALITY MANAGEMENT TEAM | £12,023.04 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £553.84 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £594.03 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £597.10 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £610.74 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £813.62 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £822.20 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,306.60 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,458.98 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,951.80 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.35 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £510.83 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £515.45 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £517.68 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £523.83 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £546.73 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £548.53 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £593.30 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £595.68 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £600.85 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £619.70 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £679.28 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £802.97 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,005.46 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,023.45 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,048.03 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,092.28 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,111.13 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,233.28 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,388.47 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,580.15 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,810.29 |
| December 15 2010 | not provided | CHILD & PARENTING SUPPORT SERVICE GENERAL | £1,875.10 |
| December 16 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £900.00 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,093.49 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,100.00 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,217.49 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,518.50 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,538.34 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,600.96 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,600.96 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,961.18 |
| December 16 2010 | not provided | CHILDREN WITH DISABILITIES | £6,153.81 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £6,468.15 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £7,795.26 |
| December 16 2010 | not provided | CHILDREN WITH DISABILITIES | £7,905.00 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £8,015.36 |
| December 16 2010 | not provided | LOCALITY MANAGEMENT TEAM | £9,280.47 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £78.01 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £82.35 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £214.21 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £248.40 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £421.20 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £135.45 |
| December 17 2010 | not provided | HLTA SUPPORT | £750.00 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £845.00 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £926.25 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £975.00 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £1,170.00 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £1,193.75 |
| December 17 2010 | not provided | GRADUATE TEACHER PROGRAMME | £1,600.00 |
| December 17 2010 | not provided | MEDICAL SERVICE CENTRAL | £510.00 |
| December 17 2010 | not provided | MEDICAL SERVICE CENTRAL | £550.00 |
| December 17 2010 | not provided | HOTHERSALL LODGE | £675.00 |
| December 20 2010 | not provided | ALTERNATIVE & COMPLIMENTARY EDUCATION GENERAL | £836.00 |
| December 20 2010 | not provided | EY COMMUNITY CHILDMINDING SCHEME | £608.00 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-3,093.49 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-3,093.49 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-3,093.49 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £-1,458.27 |
| December 20 2010 | not provided | IS & P TEAM GENERAL | £1,018.50 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,148.05 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,977.10 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,007.68 |
| December 20 2010 | not provided | LOCALITY MANAGEMENT TEAM | £5,901.78 |
| December 21 2010 | not provided | SPECIAL EDUCATIONAL NEEDS | £45.00 |
| December 21 2010 | not provided | SPECIAL EDUCATIONAL NEEDS | £103.50 |
| December 21 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £445.00 |
| December 21 2010 | not provided | COMMUNITY COHESION CENTRE | £1,230.69 |
| December 22 2010 | not provided | FOSTERING | £620.01 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | FOSTERING | £610.00 |
| December 22 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £450.00 |
| December 22 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 22 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 22 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £550.00 |
| December 22 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| December 22 2010 | not provided | LOCALITY MANAGEMENT TEAM | £3,538.34 |
| December 22 2010 | not provided | LOCALITY MANAGEMENT TEAM | £4,380.30 |
| December 23 2010 | not provided | EDUCATION PSYCHOLOGY | £825.50 |
| December 23 2010 | not provided | PROFESSIONAL DEVELOPMENT SERVICE | £855.40 |
| December 23 2010 | not provided | MUSIC GENERAL | £623.60 |
| December 23 2010 | not provided | EYFS OUTDOOR PLAY | £897.20 |
| December 23 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £650.00 |
| December 23 2010 | not provided | BALLADEN CC | £875.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £450.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £450.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £550.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £800.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £1,100.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £1,250.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £3,000.00 |
| December 30 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £990.00 |
| December 30 2010 | not provided | NON MAINSTREAM GENERAL | £21,125.00 |
| December 30 2010 | not provided | NON MAINSTREAM GENERAL | £3,554.75 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £526.00 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £537.12 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £537.12 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £581.88 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £604.26 |
| December 31 2010 | not provided | CHILDREN WITH DISABILITIES | £850.44 |
| December 31 2010 | not provided | FOSTERING | £813.71 |
| December 31 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 31 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £500.00 |
| December 31 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £550.00 |
| December 31 2010 | not provided | LOCALITY EI & AC COUNTYWIDE | £750.00 |
| December 23 2010 | not provided | BALANCE SHEET DEFAULT | £560.42 |
| December 8 2010 | not provided | YOUTH OFFENDING TEAM | £917.38 |
| December 2 2010 | not provided | SEN OPERATIONAL | £615.00 |
| December 7 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £543.31 |
| December 8 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £996.08 |
| December 8 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £-267.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £528.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £615.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £660.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £798.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £798.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £816.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £824.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £840.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £880.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £882.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £900.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £900.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,008.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,144.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,155.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,188.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,218.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,232.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,260.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,364.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,408.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,470.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,496.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,540.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,650.00 |
| December 8 2010 | not provided | SEN OPERATIONAL | £1,806.00 |
| December 9 2010 | not provided | SEN OPERATIONAL | £600.00 |
| December 9 2010 | not provided | SEN OPERATIONAL | £1,078.00 |
| December 9 2010 | not provided | SEN OPERATIONAL | £1,155.00 |
| December 9 2010 | not provided | SEN OPERATIONAL | £1,320.00 |
| December 9 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 9 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £441.00 |
| December 9 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,228.50 |
| December 9 2010 | not provided | BURNLEY TIC | £1,479.60 |
| December 9 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £911.54 |
| December 10 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £819.00 |
| December 13 2010 | not provided | ADULTS OPERATIONAL | £442.40 |
| December 13 2010 | not provided | SEN OPERATIONAL | £528.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £528.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £550.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £565.50 |
| December 13 2010 | not provided | ADULTS OPERATIONAL | £576.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £714.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £725.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £756.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £820.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £840.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £858.00 |
| December 13 2010 | not provided | ADULTS OPERATIONAL | £880.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £880.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £924.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £945.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £968.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £990.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,015.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,040.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,100.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,176.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,218.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,232.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,249.50 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,260.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,280.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,298.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,364.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,428.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,440.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,452.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,474.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,481.25 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,496.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,535.10 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,540.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,584.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,710.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £1,760.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £2,310.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £2,565.00 |
| December 13 2010 | not provided | SEN OPERATIONAL | £2,625.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £89.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £173.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £178.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £192.25 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £220.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £262.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £346.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £378.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £441.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £504.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £546.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £567.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £588.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £630.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £672.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £682.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £693.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £693.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £819.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £819.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £819.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £882.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £945.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £955.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £955.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £955.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £955.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £955.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £997.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,008.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,008.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,018.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,018.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,134.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,197.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,207.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,291.50 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,512.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,638.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,827.00 |
| December 13 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £1,883.00 |
| December 14 2010 | not provided | SEN OPERATIONAL | £1,034.00 |
| December 14 2010 | not provided | SEN OPERATIONAL | £1,430.00 |
| December 14 2010 | not provided | ROAD SAFETY EDUCATION & TRAINING COURSES | £756.00 |
| December 15 2010 | not provided | SEN OPERATIONAL | £1,100.00 |
| December 15 2010 | not provided | SEN OPERATIONAL | £1,762.50 |
| December 16 2010 | not provided | SEN OPERATIONAL | £504.00 |
| December 16 2010 | not provided | ADULTS OPERATIONAL | £586.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £588.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £594.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £680.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £720.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £832.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,078.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,210.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,518.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,540.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,558.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,573.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,760.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,795.20 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,826.00 |
| December 16 2010 | not provided | SEN OPERATIONAL | £1,932.00 |
| December 17 2010 | not provided | SEN OPERATIONAL | £866.00 |
| December 17 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £512.23 |
| December 21 2010 | not provided | SEN OPERATIONAL | £600.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £646.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £682.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £812.80 |
| December 21 2010 | not provided | SEN OPERATIONAL | £953.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,030.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,056.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,056.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,194.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,302.00 |
| December 21 2010 | not provided | SEN OPERATIONAL | £1,342.50 |
| December 21 2010 | not provided | SEN OPERATIONAL | £2,217.60 |
| December 22 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £1,508.00 |
| December 22 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £2,476.77 |
| December 22 2010 | not provided | SEN OPERATIONAL | £572.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £616.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £792.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £861.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £945.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £1,280.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £1,470.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £1,600.00 |
| December 22 2010 | not provided | SEN OPERATIONAL | £1,760.00 |
| December 22 2010 | not provided | CARRIAGEWAY - PUBLIC REALM SOUTH | £137.86 |
| December 22 2010 | not provided | SCHOOL TRANSPORT OPERATIONAL | £791.00 |
| December 30 2010 | not provided | SEN OPERATIONAL | £510.00 |
| December 30 2010 | not provided | SEN OPERATIONAL | £1,346.40 |
| December 30 2010 | not provided | SEN OPERATIONAL | £1,452.00 |
| December 22 2010 | not provided | WOODLANDS | £3,402.29 |
| December 1 2010 | not provided | ISB GENERAL | £890.00 |
| December 8 2010 | not provided | ISB GENERAL | £440.00 |
| December 8 2010 | not provided | ISB GENERAL | £491.54 |
| December 23 2010 | not provided | DOP / MANAGEMENT TEAM | £569.00 |
| December 13 2010 | not provided | FINANCE GROUP | £-680.00 |
Last updated 13 May 19:27 (about 1 year ago)