- Bedford Borough Council (Total spend: £39,666, Average monthly spend: £19,833)
- Wirral Metropolitan Borough (Total spend: £60,770, Average monthly spend: £60,770)
- Brighton and Hove City Council (Total spend: £48,698, Average monthly spend: £9,739)
- Plymouth City Council (Total spend: £600, Average monthly spend: £600)
| Date | Department | Category | Value |
|---|---|---|---|
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £209,738.00 |
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £142,264.00 |
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £90,701.00 |
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £82,494.00 |
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £81,877.00 |
| Aug 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £29,323.00 |
| Aug 2010 | BUILDING PRACTICE HOLDING A/C | COPS HOLDING ACCOUNT | £7,901.29 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £5,763.37 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,300.26 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,238.37 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,993.84 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,981.02 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,908.49 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,593.03 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,582.56 |
| Aug 2010 | BUILDING PRACTICE HOLDING A/C | COPS HOLDING ACCOUNT | £4,448.71 |
| Aug 2010 | DISCRETIONARY ASSISTANCE | N H S - ENVIRONMENTAL HEALTH | £4,195.13 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £4,052.72 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,052.07 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £3,877.50 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £3,221.99 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £3,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £2,638.29 |
| Aug 2010 | CAP REV 09/10 | CENTRAL LIBRARY - STONEWORK, RW GOODS | £2,489.33 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £2,433.61 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,236.56 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,175.63 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £2,000.00 |
| Aug 2010 | MANDATORY D F G'S | ADAPTATIONS | £2,000.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,946.97 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,682.35 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,636.51 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Aug 2010 | RENOVATION PROGRAMME | N H S - ENVIRONMENTAL HEALTH | £1,511.00 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,308.12 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,256.92 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £723.49 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £685.54 |
| Aug 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £558.36 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £256,972.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £113,026.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £90,779.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £86,500.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £76,831.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £37,662.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £33,160.00 |
| Sep 2010 | PLANNED PROGRAMME | PROGRAMMED WORKS - BLOCK INVESTMENT | £22,331.00 |
| Sep 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £14,923.00 |
| Sep 2010 | BUILDING PRACTICE HOLDING A/C | COPS HOLDING ACCOUNT | £8,817.43 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £8,804.53 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,777.76 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,377.88 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,000.00 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,299.48 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,106.81 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,675.20 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,642.75 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,628.18 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,389.80 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,190.84 |
| Sep 2010 | OTHER CAPITAL SCHEMES | not provided | £714.69 |
| Sep 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £682.64 |
| Nov 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Nov 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £608.25 |
| Nov 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,201.57 |
| Nov 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,742.26 |
| Oct 2010 | HOUSING SOLUTIONS | HOUSING SOLUTIONS | £6,955.17 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,903.20 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,810.24 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £88,727.00 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £7,481.40 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £44,416.00 |
| Oct 2010 | MANDATORY D F G'S | ADAPTATIONS | £1,957.85 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,305.49 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,510.25 |
| Oct 2010 | MODERNISATION 2008/09 | HIGHRIDGE INFANT AND BISHOPSWORTH JUNIOR | £1,386.35 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £255,959.00 |
| Oct 2010 | PRIMARY DEVOLVED FORMULA CAPITAL | 089 MILLPOND COUNTY PRIMARY | £11,644.66 |
| Oct 2010 | PRIMARY DEVOLVED FORMULA CAPITAL | 089 MILLPOND COUNTY PRIMARY | £1,871.17 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,896.15 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £2,557.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,375.31 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,381.33 |
| Oct 2010 | DISCRETIONARY ASSISTANCE | N H S - ENVIRONMENTAL HEALTH | £1,957.85 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £50,860.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,795.09 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £1,840.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,536.54 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,006.53 |
| Oct 2010 | MANDATORY D F G'S | ADAPTATIONS | £6,466.23 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,477.03 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,996.38 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,533.07 |
| Oct 2010 | SECONDARY DEVOLVED FORMULA CAPITAL | 781 REDLAND GREEN SECONDARY SCHOOL | £16,683.18 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,586.75 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,576.52 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £78,738.00 |
| Oct 2010 | PLANNED PROGRAMME | PROGRAMMED WORKS - BLOCK INVESTMENT | £16,910.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,077.43 |
| Oct 2010 | HOUSING SOLUTIONS | HOUSING SOLUTIONS | £6,955.17 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,903.20 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,810.24 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £88,727.00 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £7,481.40 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £44,416.00 |
| Oct 2010 | MANDATORY D F G'S | ADAPTATIONS | £1,957.85 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,305.49 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,510.25 |
| Oct 2010 | MODERNISATION 2008/09 | HIGHRIDGE INFANT AND BISHOPSWORTH JUNIOR | £1,386.35 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £255,959.00 |
| Oct 2010 | PRIMARY DEVOLVED FORMULA CAPITAL | 089 MILLPOND COUNTY PRIMARY | £11,644.66 |
| Oct 2010 | PRIMARY DEVOLVED FORMULA CAPITAL | 089 MILLPOND COUNTY PRIMARY | £1,871.17 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £3,896.15 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £2,557.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,375.31 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,381.33 |
| Oct 2010 | DISCRETIONARY ASSISTANCE | N H S - ENVIRONMENTAL HEALTH | £1,957.85 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £50,860.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,795.09 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £1,840.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,536.54 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,006.53 |
| Oct 2010 | MANDATORY D F G'S | ADAPTATIONS | £6,466.23 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,477.03 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,996.38 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £1,579.64 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,533.07 |
| Oct 2010 | SECONDARY DEVOLVED FORMULA CAPITAL | 781 REDLAND GREEN SECONDARY SCHOOL | £16,683.18 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £2,586.75 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £4,576.52 |
| Oct 2010 | PLANNED PROGRAMME | PLANNED PROGRAMMES - (CONTRACT ROK) | £78,738.00 |
| Oct 2010 | PLANNED PROGRAMME | PROGRAMMED WORKS - BLOCK INVESTMENT | £16,910.00 |
| Oct 2010 | OTHER CAPITAL SCHEMES | DISABLED ADAPTATIONS | £5,077.43 |