<?xml version="1.0" encoding="UTF-8"?>
<document>
  <body>&lt;div class=&quot;mgLinks&quot;&gt;
&lt;ul class=&quot;mgActionList&quot;&gt;
&lt;li&gt;&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgMeetingAttendance.asp?ID=4446&quot; class=&quot;external&quot; title=&quot;Link to attendance details for the meeting of CabinetTuesday, 2nd December, 2008 7.15 p.m.&quot;&gt;Attendance details&lt;/a&gt;&lt;/li&gt;
			&lt;li&gt;
&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=4369&amp;amp;T=0&quot; class=&quot;external&quot; title=&quot;Link to agenda frontsheet pdf file&quot;&gt;Agenda Frontsheet&lt;/a&gt;
			&lt;span class=&quot;mgFileSize&quot;&gt; PDF 45 KB&lt;/span&gt; 
			&lt;/li&gt;

				&lt;li&gt;
&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=4369&amp;amp;T=10&quot; class=&quot;external&quot; title=&quot;Link to agenda reports document pack pdf file&quot;&gt;Agenda reports pack&lt;/a&gt;
&lt;span class=&quot;mgFileSize&quot;&gt; PDF 6 MB&lt;/span&gt; &lt;/li&gt;

				&lt;li&gt;
&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=4369&amp;amp;T=1&quot; class=&quot;external&quot; title=&quot;Link to printed minutes pdf file&quot;&gt;Printed minutes&lt;/a&gt;
&lt;span class=&quot;mgFileSize&quot;&gt; PDF 61 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;/div&gt;&lt;div class=&quot;mgContent&quot;&gt;		&lt;p&gt;&lt;span class=&quot;mgLabel&quot;&gt;Venue: &lt;/span&gt;Committee Room 1, Town Hall, High Road, Ilford, Essex IG1 1DD&lt;/p&gt;
		&lt;p&gt;&lt;span class=&quot;mgLabel&quot;&gt;Contact: &lt;/span&gt;Sazeda Ibrahim, Committee Support Officer&#160; 
		Telephone: 020 8708 2315 or Email: &#160;&lt;a href=&quot;mailto:sazeda.ibrahim@redbridge.gov.uk&quot; class=&quot;external&quot;&gt;sazeda.ibrahim@redbridge.gov.uk&lt;/a&gt;
		&lt;/p&gt;
		
Items
		
No.
			Item
		

&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31427&quot;&gt;&lt;/a&gt;1.&lt;/p&gt;
				
					
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Apologies for absence (CAB/01/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;
&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;To receive any apologies for absence&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;
&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;None.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		
		

&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31428&quot;&gt;&lt;/a&gt;2.&lt;/p&gt;
				
					
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Declaration of Interest (CAB/02/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;
&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span&gt;&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt; PDF 83 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
&lt;li&gt;
						&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=35116&quot; class=&quot;external&quot; title=&quot;Link to document 'GeariesPlans' pdf file&quot;&gt;GeariesPlans, item14.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt; PDF 131 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;
&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report presented proposals for the
establishment of a Children&#8217;s Centre at Gearies Infants
School. A report was presented to Cabinet on 20&lt;sup&gt;th&lt;/sup&gt;
February 2007 giving details of the Government&#8217;s 10 year
Childcare Strategy and proposals for establishing a number of
Children&#8217;s Centres in Redbridge. Children&#8217;s Centres
would play a central role in delivering improved outcomes for all
young children and in reducing inequalities between the most
disadvantaged children and the rest.&lt;span&gt;&#160;&lt;/span&gt; They were at the heart of the
Government&#8217;s &#8220;Every Child Matters: Change for Children
Programme&#8221;.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Department split the Children&#8217;s
Centre programme into three phases for Children, Schools and
Families&#8217; (DCSF) Sure Start Unit. In Phase 1 (2004-2006) four
Children&#8217;s Centres were established in Redbridge. In Phase 2
(2006-2008) Redbridge was developing an additional 10
Children&#8217;s Centres.&lt;span&gt;&#160;&lt;/span&gt; Phase 2 had been slipped
nationally for one year to extend the completion of Phase 2
Children&#8217;s Centres.&lt;span&gt;&#160;&#160;&lt;/span&gt; A further 8 were to be
established in Phase 3 (2008-2010).&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report also presented the outline scheme
and estimate for the proposed children&#8217;s centre. It sought
approval to apply the budget for this scheme as required by
Standing Order 125.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That
we&lt;span&gt;&#160;&lt;/span&gt; (i) agree to the
establishment of a Children&#8217;s Centre at Gearies Infants
School;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
(ii) agree the outline scheme for the proposed Children&#8217;s
Centre at Gearies Infants School as further described in Appendix A
and shown in Appendix B to the report;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
(iii) agree the outline estimate in the sum of &#163;677,628 for
the proposed Children&#8217;s Centre at Gearies Infants School as
further described in Appendix A and shown in Appendix B to the
report; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&#160;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
(iv) authorise the Chief Property Manager to proceed with the
detailed design and to procure the necessary works in accordance
with Standing Orders.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&#160;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		
		

&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31686&quot;&gt;&lt;/a&gt;15.&lt;/p&gt;
				
					
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=35117&quot; class=&quot;external&quot; title=&quot;Link to document 'Update on the progress with the Loxford School of Science and Technology One School Pathfinder Building Programme (CAB/15/021208)' pdf file&quot;&gt;Update on the progress with the Loxford School of Science and Technology One School Pathfinder Building Programme (CAB/15/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt; PDF 47 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
&lt;li&gt;
						&lt;a href=&quot;http://moderngov.redbridge.gov.uk/mgConvert2PDF.asp?ID=35118&quot; class=&quot;external&quot; title=&quot;Link to document 'LoxfordAppdx' pdf file&quot;&gt;LoxfordAppdx, item15.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt; PDF 15 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;
&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&lt;span&gt;The report
detailed how at its meeting on 2&lt;sup&gt;nd&lt;/sup&gt; October 2007, Cabinet
agreed that the Stage One contract for construction of the Loxford
Building Schools for the Future One School Pathfinder (BSF OSP)
project should be awarded to Willmott Dixon Limited.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&lt;span&gt;At its meeting
on 15&lt;sup&gt;th&lt;/sup&gt; April 2008, Cabinet agreed that the Stage Two
contract for construction of the Loxford Building Schools for the
Future One School Pathfinder (BSF OSP) project would also be
awarded to Willmott Dixon Limited.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&lt;span&gt;These awards
excluded the provision of Information and Communications Technology
(ICT), associated services and the provision of fixed furniture and
equipment (FF&amp;amp;E) which was the subject of a separate
procurement.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;
&lt;span&gt;This report
provided Members with an update on the current position in relation
to the main building contract and the associated budgetary
position. It also advised Members of the risks that the project was
running and the contingency arrangements that were in
place.&lt;span&gt;&#160;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoBodyTextIndent2&quot;&gt;
&lt;b&gt;&lt;span&gt;&lt;/div&gt;
&lt;/div&gt;</body>
  <created-at type="datetime">2009-06-27T08:17:09+01:00</created-at>
  <document-owner-id type="integer">3664</document-owner-id>
  <document-owner-type>Meeting</document-owner-type>
  <document-type>Minutes</document-type>
  <id type="integer">2421</id>
  <precis>
Attendance details
Agenda Frontsheet
 PDF 45 KB 
Agenda reports pack
 PDF 6 MB 
Printed minutes
 PDF 61 KB 
Venue: Committee Room 1, Town Hall, High Road, Ilford, Essex IG1 1DD
Contact: Sazeda Ibrahim, Committee Support Officer&#160; 
Telephone: 020 8708 2315 or Email: &#160;sazeda.ibrahim@redbridge.gov.uk
Items
No.
Item
1.
Apologies for absence (CAB/01/021208)
To receive any apologies for absence
Minutes:
None.
2.
Declaration of Interest (CAB/02/021208)
  PDF 83 KB 
Additional documents:
GeariesPlans...</precis>
  <raw-body>&lt;div class=&quot;mgLinks&quot;&gt;
&lt;ul class=&quot;mgActionList&quot;&gt;

		&lt;li&gt;&lt;a href=&quot;mgMeetingAttendance.asp?ID=4446&quot; title=&quot;Link to attendance details for the meeting of CabinetTuesday, 2nd December, 2008 7.15 p.m.&quot;&gt;Attendance details&lt;/a&gt;&lt;/li&gt;
			&lt;li&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=4369&amp;amp;T=0&quot; title=&quot;Link to agenda frontsheet pdf file&quot;&gt;Agenda Frontsheet&lt;/a&gt;
			&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; alt=&quot;pdf icon&quot; /&gt; PDF 45 KB&lt;/span&gt; 
			&lt;/li&gt;

				&lt;li&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=4369&amp;amp;T=10&quot; title=&quot;Link to agenda reports document pack pdf file&quot;&gt;Agenda reports pack&lt;/a&gt;
&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; alt=&quot;pdf icon&quot; /&gt; PDF 6 MB&lt;/span&gt; &lt;/li&gt;

				&lt;li&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=4369&amp;amp;T=1&quot; title=&quot;Link to printed minutes pdf file&quot;&gt;Printed minutes&lt;/a&gt;
&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; alt=&quot;pdf icon&quot; /&gt; PDF 61 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;/div&gt;&lt;div class=&quot;mgContent&quot;&gt;		&lt;p&gt;&lt;span class=&quot;mgLabel&quot;&gt;Venue: &lt;/span&gt;Committee Room 1, Town Hall, High Road, Ilford, Essex IG1 1DD&lt;/p&gt;
		&lt;p&gt;&lt;span class=&quot;mgLabel&quot;&gt;Contact: &lt;/span&gt;Sazeda Ibrahim, Committee Support Officer&amp;nbsp; 
		Telephone: 020 8708 2315 or Email: &amp;nbsp;&lt;a href=&quot;mailto:sazeda.ibrahim@redbridge.gov.uk&quot;&gt;sazeda.ibrahim@redbridge.gov.uk&lt;/a&gt;
		&lt;/p&gt;
		&lt;table class=&quot;mgItemTable&quot; id=&quot;mgItemTable&quot; summary=&quot;Table of agenda items&quot;&gt;
		&lt;caption class=&quot;mgSectionTitle&quot;&gt;Items&lt;/caption&gt;
		&lt;tr&gt;

			&lt;th scope=&quot;col&quot; abbr=&quot;No&quot;&gt;No.&lt;/th&gt;
			&lt;th scope=&quot;col&quot; abbr=&quot;Item&quot;&gt;Item&lt;/th&gt;
		&lt;/tr&gt;

		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31427&quot;&gt;&lt;/a&gt;1.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Apologies for absence (CAB/01/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;To receive any apologies for absence&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;None.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31428&quot;&gt;&lt;/a&gt;2.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Declaration of Interest (CAB/02/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;Members
are reminded of the requirement to consider whether they have an
interest in any matter on the agenda that needs to be disclosed
and, if so, to declare an interest when the Committee reaches that
item on the agenda.&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Members were reminded of the requirement to
consider whether they had an interest in any matter on the agenda
that needed to be disclosed and, if so, to declare an interest when
the Committee reached that item on the agenda.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31429&quot;&gt;&lt;/a&gt;3.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Public Participation: Statements, Questions, Deputations and Petitions (CAB/03/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;To hear
statements and questions from members of the public.&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The following speakers addressed the
Cabinet:-&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(1) David Sevant &amp;ndash; Council Tax and
Council Benefit figures&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(2) Nicholas Hurst &amp;ndash; Relocation of
Frenford Club and The Academy&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(3) Lorraine Silver &amp;ndash; Relocation of
Frenford Club and the Academy&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(4) Gareth Phillips &amp;ndash; Five Oaks Lane
&amp;ndash; Compulsory Purchase Order&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(5) Mr Walker &amp;ndash; Five Oaks Lane &amp;ndash;
Compulsory Purchase Order&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;/td&gt;
						
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Variation in Order of Business&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; that in accordance with
Standing Order 47.6, item 17 &amp;ldquo;Five Oaks Lane &amp;ndash;
Compulsory Purchase Order&amp;rdquo; be taken at this stage.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31689&quot;&gt;&lt;/a&gt;4.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35098&quot; title=&quot;Link to document 'Five Oaks Lane - Compulsory Purchase Order (CAB/04/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Five Oaks Lane - Compulsory Purchase Order (CAB/04/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 90 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35099&quot; title=&quot;Link to document 'FiveOaksLaneAppdx1' pdf file&quot;&gt;FiveOaksLaneAppdx1, item4.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 192 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35100&quot; title=&quot;Link to document 'FiveOaksLaneAppdx2' pdf file&quot;&gt;FiveOaksLaneAppdx2, item4.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 2 MB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35101&quot; title=&quot;Link to document 'FiveOaksLaneAppdx3' pdf file&quot;&gt;FiveOaksLaneAppdx3, item4.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 2 MB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35102&quot; title=&quot;Link to document 'FiveOaksLaneAppdx4' pdf file&quot;&gt;FiveOaksLaneAppdx4, item4.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 27 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;This report sought authority to initiate
Compulsory Purchase Order proceedings for the purposes of
assembling land for residential development at Five Oaks Lane,
Chigwell.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The land was part of the Metropolitan Green
Belt and comprised a mix of commercial, industrial and residential
uses which had given rise to land use conflict and complaints to
the Council over many years. In 2001, the Council issued planning
permissions for a scheme by Countryside Properties to
comprehensively redevelop Five Oaks Lane to construct 425 homes, of
which 35% were to be affordable. The scheme would bring about
important public benefits, including removing conflicting land uses
and improving the openness of the Green Belt by returning the
eastern half of the site to open space.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Countryside commenced land assembly at Five
Oaks Lane in the 1980s and controlled just over half the site area,
but development had been frustrated by several landowners, some of
whom were either unwilling to sell or seeking unrealistic prices
that rendered the scheme uneconomic.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Planning permissions for the development
remained current and the Council&amp;rsquo;s Local Development
Framework provided continuing acknowledgment of, and planning
policy support for the scheme. The 425 new homes formed an
important part of the Council&amp;rsquo;s policy commitment to housing
growth, which would be endangered should the scheme fail to
progress. This scheme represented about 5% of the Council&amp;rsquo;s
housing target up to 2017.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The planning permissions set out a process
whereby compulsory purchase might be deployed and a formal request
had been received from Countryside Properties to trigger the use of
this power. This involved the Council compulsorily acquiring the
properties under the statutory compensation code which would then
be transferred on a back-to-back basis to Countryside Properties.
All costs associated with the process together with the
compensation payments were to be covered by Countryside Properties
and an indemnity agreement was ready to be executed. There should
be no cost to the Council.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Compulsory Purchase Order would be invoked
against the whole area to be developed in order to deal with any
rights of way, restrictive covenants etc. which might be found to
exist. However, in the event, some properties would already be
owned by Countryside Properties and others might be negotiated by
agreement.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;At this stage authority was sought for a
decision in principle to consider the use of compulsory purchase
powers and to authorise officers to take preliminary steps to
prepare necessary documentation and to prepare a report to
authorise the exercise of the powers. These steps would include
discussions with present landowners, preparatory legal and
administrative work, briefings etc. Following these actions, the
matter would be referred back to Cabinet to consider a final
decision as to whether to make a Compulsory Purchase Order.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;We received representations from two speakers
asking if the Council had enough information to proceed and asking
for an independent evaluation.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&lt;b&gt;Resolved:&lt;/b&gt; &lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;That
we (i) agree in principle to exercise compulsory purchase powers
over all the land and properties at Five Oaks Lane, Chigwell within
the area indicated at Appendix 1 pursuant to Section 226(1)(a) of
the Town &amp;amp; Country Planning Act 1991 subject to a further
report at the earliest opportunity including responses to the
issues raised by public speakers at the meeting and confirming the
area of land to be acquired and setting out the full case and
reasons for the action to be taken;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(ii) grant authority for the Director of Environment and
Regeneration or persons authorised by him to exercise powers
contained under Sections 324 and 325 of the Town and Country
Planning Act 1990 to gain entry to land and premises for the
purpose of surveying it or estimating its value;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iii) authorise service of notices under Section 330 of the Town
and Country Planning Act 1990 to obtain information regarding the
premises from owners and occupiers,&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iv) authorise the completion of an Indemnity Agreement with
Countryside Properties PLC to ensure all costs incurred by the
Council in undertaking further preliminary steps and any subsequent
work on the Compulsory Purchase Order and subsequent compensation
are fully reimbursed by Countryside Properties PLC and that
Countryside Properties PLC will indemnify the Council in respect of
all compensation claims for which the Council may be liable if it
makes and implements the Compulsory Purchase Order.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31430&quot;&gt;&lt;/a&gt;5.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Minutes of the previous meeting 4th November 2008 for approval (CAB/05/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;q-family:\&quot;Myriad Pro\&quot;;mso-ansi-language: EN-US&quot;&gt;Circulated separately.&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That the report of our
meeting held on 4&lt;sup&gt;th&lt;/sup&gt; November 2008 be agreed and signed
by our Chairman when available in the minute book.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31441&quot;&gt;&lt;/a&gt;6.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35083&quot; title=&quot;Link to document 'Forward Plan and Work Programme (CAB/06/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Forward Plan and Work Programme (CAB/06/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 22 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35084&quot; title=&quot;Link to document 'Fplan Dec 08 - Mar 09' pdf file&quot;&gt;Fplan Dec 08 - Mar 09, item6.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 87 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;At Redbridge it had become practice for the
Cabinet to agree its Work Programme for the following four months
at each meeting.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family: Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;The
Work Programme consisted of two elements:&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family: Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:.25in;text-indent:-.25in;mso-list:l0 level1 lfo2; tab-stops:list .25in .75in&quot;&gt;
&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-family:Arial&quot;&gt;(i)&lt;span style=&quot;font:7.0pt \&quot;Times New Roman\&quot;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/span&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Key decisions to be taken by
the Cabinet, Area Committees and Officers that would also be
included in the Leader&amp;rsquo;s published Forward Plan.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:.25in;text-indent:-.25in;mso-list:l0 level1 lfo2; tab-stops:list .25in .75in&quot;&gt;
&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-family:Arial&quot;&gt;(ii)&lt;span style=&quot;font:7.0pt \&quot;Times New Roman\&quot;&quot;&gt;&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/span&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Other matters that were not
key decisions, but that fell to be decided by the
Cabinet.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoList&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Appendix A of the report informed Members of
the Cabinet&amp;rsquo;s proposed Work Programme for the next four
months.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;It was for Cabinet to determine its own work
programme.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; To the
extent that this programme included the making of any key decisions
these must be included in the statutory Forward Plan.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; Regulation 13 of the Local
Authorities (Executive Arrangements) (Access to Information)
(England) Regulations 2000 required the Leader to prepare a Forward
Plan which contained details of all the matters which were likely
to be the subject of key decisions for a period of four
months.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; This included
all decisions, whether they were to be made by Members or
Officers.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The plan had
effect from the first working day of each month and each new plan
had to be produced at least 14 days before it came into effect.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt;&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; That we agree the items shown in
the Work Programme attached at Appendix A of the report and note
that any items that are key decisions will also (where time
permits) be included in the published Forward Plan.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31812&quot;&gt;&lt;/a&gt;7.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35085&quot; title=&quot;Link to document 'Outcomes of Consultation on 2009-10 Budget Priorities (CAB/07/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Outcomes of Consultation on 2009-10 Budget Priorities (CAB/07/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 454 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;mso-ansi-language:EN-US&quot;&gt;We were advised that this was the ninth year the Council
had undertaken a budget consultation exercise&lt;/span&gt; &lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;q-family:MyriadPro-Regular; mso-ansi-language:EN-US&quot;&gt;and the report set out the results of the first
stage of the consultation on the 2009-10 priorities.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;q-family:MyriadPro-Regular; mso-ansi-language:EN-US&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;mso-ansi-language:EN-US&quot;&gt;The approach to the consultation process had been shaped by
feedback from previous years.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;mso-ansi-language:EN-US&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;mso-ansi-language:EN-US&quot;&gt;The report highlighted statistical and qualitative evidence
of public opinion to assist Members in setting the 2009-10 budget,
gathered from a borough-wide questionnaire and focus
groups.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-layout-grid-align: none;text-autospace:none&quot;&gt;
&lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;mso-ansi-language:EN-US&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt;
&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;That we (i) consider
the outcomes of the budget consultation as part of our proposals
for the 2009-10 Council budget, and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;(ii) agree to receive
a report on 12&lt;sup&gt;th&lt;/sup&gt; January 2009 outlining the results of
the supplementary budget consultation survey being undertaken in
Area 1.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31442&quot;&gt;&lt;/a&gt;8.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35111&quot; title=&quot;Link to document 'The Future of the Chadwell Day Centre for Adults with a Learning Disability (CAB/08/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;The Future of the Chadwell Day Centre for Adults with a Learning Disability (CAB/08/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 73 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Cabinet at its meeting on
6&lt;sup&gt;th&lt;/sup&gt; October, 2008, agreed to formally consult service
users, carers and other stakeholders on the future of the Chadwell
Centre, a day centre for adults with a learning disability. The
consultation was undertaken from 7&lt;sup&gt;th&lt;/sup&gt; October to
14&lt;sup&gt;th&lt;/sup&gt; November, facilitated by a voluntary sector
organisation, Redbridge Forum, and using a variety of approaches
&amp;ndash; these were further described in the officer report which
was at Appendix A to the report.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;The consultation was
extensive, canvassing the views of 307 family carers, 162 service
users, and other stakeholders.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; These included service users and
carers who were directly involved with Chadwell, as well as carers
and service users involved in other services, and those who might
use the service in the future.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;The response to the
consultation was very mixed:&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; inevitably, a number of service
users and carers who were currently using Chadwell favoured
retaining the centre. Concerns raised by these service users
focussed on the stability which had been offered by the centre,
anxiety about change, and a wish to maintain friendship
groups.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Responses from some Chadwell
users, those who had left Chadwell, or chosen other services,
confirmed that this majority of service users and family carers
were pleased that a wider range of activities was now being offered
from more sites &amp;ndash; and that more were being
developed.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;The consultation confirmed
that there was no prospect of the service at Chadwell being
expanded or modernised in any significant way.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; As several current service users
had expressed a wish to move on, the service was set to decline
further from the current usage of 34% capacity.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The service would become unviable
in the near future.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Under these circumstances,
and in the context of a range of suitable options being available
for the current Chadwell service users, this report recommended
that the centre be closed by the end of June 2009.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:15.6pt;mso-pagination:none;tab-stops: 106.35pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;In light of the concerns
raised during the consultation, particular sensitivity would be
required in relation to offering suitable options to all current
Chadwell service users, and to providing specific support to
promote the continuation of existing friendship circles
.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That
we (i) agree to decommission the Chadwell service by July
1&lt;sup&gt;st&lt;/sup&gt; 2009;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;(ii) offer alternative
services to those using the Chadwell service during this
period;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;(iii) transfer the
property to a non-operational portfolio; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;(iv) delegate
authority to the Chief Officer of the Learning Disability
Partnership, in consultation with the Chief Human Resources
Officer, to manage any staffing issues that are incidental to the
decision to decommission the Chadwell service.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31444&quot;&gt;&lt;/a&gt;9.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35086&quot; title=&quot;Link to document 'Budgetary Control Report for September 2008 (CAB/09/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Budgetary Control Report for September 2008 (CAB/09/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 78 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35087&quot; title=&quot;Link to document 'budgetarycontrolAppdxBCD' pdf file&quot;&gt;budgetarycontrolAppdxBCD, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 30 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35088&quot; title=&quot;Link to document 'budgetarycontrolAppdxE' pdf file&quot;&gt;budgetarycontrolAppdxE, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 39 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35089&quot; title=&quot;Link to document 'budgetarycontrolAppdxF' pdf file&quot;&gt;budgetarycontrolAppdxF, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 34 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35090&quot; title=&quot;Link to document 'budgetarycontrolAppdxG' pdf file&quot;&gt;budgetarycontrolAppdxG, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 22 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35091&quot; title=&quot;Link to document 'budgetarycontrolAppdxH' pdf file&quot;&gt;budgetarycontrolAppdxH, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 83 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35092&quot; title=&quot;Link to document 'budgetarycontrolAppdxI' pdf file&quot;&gt;budgetarycontrolAppdxI, item9.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 23 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;The report before us
set out the financial performance of the Authority over its revenue
and capital programmes for the first six months of the financial
year.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The year-end
projections showed a General Fund revenue overspend of
&amp;pound;805,000 before the application of any markers.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;The Capital Programme
was currently showing an overspend for the year to date but an
overall projected net underspend for the year due to re-phasing of
internally funded schemes in 2008/09 of &amp;pound;6.898
million.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; There was an
underspend of &amp;pound;647,000 on externally funded schemes.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;The Housing Revenue
Account was projecting an overspend of &amp;pound;350,000 and the
Dedicated Schools Grant was projecting to be underspent at the
year-end by &amp;pound;286,000.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;As the year-end
projections were only based on six months, there was time for some
budget variations to be addressed or for new trends to emerge.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That
we (i) note the potential year-end budget variations in relation to
the 2008/09 budget.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31879&quot;&gt;&lt;/a&gt;10.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35136&quot; title=&quot;Link to document 'Relocation of Frenford Club &amp;amp; The Academy (CAB/10/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Relocation of Frenford Club &amp;amp; The Academy (CAB/10/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 66 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report detailed how in July 2007, Cabinet
agreed to submit an expression of interest (EOI) for a new six form
of entry secondary Academy school on the Cricklefields site.
Ministerial approval was received for the project to proceed to the
feasibility stage in April 2008 and this work was currently
underway.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;A crucial part of the Academy project was the
relocation of the Frenford Club (FC) in order that the school could
be built on the Cricklefields site. The FC also had a facility at
Oakfield and wished to move to a single facility. This was part of
the Council&amp;rsquo;s longer-term asset management plan.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;FC would be required to enter into a suite of
agreements that bound them to relocating from their Cricklefields
and Oakfield sites. The Frenford Club would be required to move
from the Cricklefields site by April 2010.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;It was proposed that the FC be relocated to
part of the PLA site. The Council would be responsible for building
a new Pavilion and providing new pitches on the site. At the
conclusion of the construction works, the Council would grant the
FC a 99 year lease for facilities on the PLA site.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; This would be on terms similar to
those of the two existing leases between the Council and the FC for
their premises on Cricklefields and Oakfield which the FC would
surrender in order to move to the PLA site.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;It was proposed that the Council should
provide the FC Pavilion by appointing an architect to take the
Pavilion to RIBA Stage D and through the planning process. In
parallel, the Council would let a Design and Build contract. A
mini-competition would be used to select from contractors who were
already retained for relevant works and services under the terms of
the South East Centre of Excellence (SECE) procurement arrangement,
or by another appropriate procurement route.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b style=&quot;q-bidi-font-weight: normal&quot;&gt;Resolved:&lt;/b&gt; &lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;That we&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; (i) delegate to the Chief
Culture, Sport and Community Learning Officer, the Chief Planning
and Resources Officer, and the Chief Property Manager in
consultation with the Cabinet Member for Children&amp;rsquo;s Services
and the Cabinet Member for Leisure, Culture and the Olympics, the
authority, subject to the Council&amp;rsquo;s approval of the scheme
within the 2009/10-2013/14 Capital Programme, to finalise terms
with the Frenford Club to enter into a building agreement and
agreement for the lease in respect of part of the PLA site. Under
these agreements the Council will construct a Pavilion and
associated works and at the conclusion of the works will grant a
lease to the Frenford Club in exchange for the surrender of its
current leasehold interests in respect of the Cricklefields and
Oakfield sites;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;(ii) approve expenditure of up to
&amp;pound;250,000 for the design and development costs of the Pavilion
and associated works from the capital budget of the Major Leisure
Development Project;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;(iii) note that the Chief Culture, Sport
and Community Learning Officer proposes, in accordance with
Standing Order 91.1.(ii), to seek a single quotation from ATP Group
for design and feasibility work leading to planning application
referred to in (iv) below; and&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;(iv) note that the Chief Culture, Sport
and Community Learning Officer will be submitting a planning
application in respect of the PLA site for a Pavilion and
associated works for the Frenford Club in order to facilitate the
relocation of the club from its current sites (Cricklefields and
Oakfield) to the PLA site.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31804&quot;&gt;&lt;/a&gt;11.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35113&quot; title=&quot;Link to document 'Provision of Primary School Places (CAB/11/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Provision of Primary School Places (CAB/11/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 73 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;This report detailed
how the primary aged school population had risen sharply over the
last five years. Current pupil projections showed a further rise in
demand for primary school places that could not be met by the
current supply of school places&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;During the summer term of 2008, there were an
unusually high volume of late applications for primary places. The
previously stable ratio of the number of births to the number of
applications for reception places&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; (the transition ratio) increased
by approximately10% resulting in an increase of approximately 300
reception children.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Some of this increased demand was accommodated
using a planned surplus of places. The remainder had been met by
opening four additional reception classes as an emergency
measure.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Should the ratio of births to reception
applications seen in 2008 be maintained in 2009 there could again
be insufficient reception places. Officers were therefore proposing
to make contingency arrangements to cope with this increased
demand.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:36.0pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;By 2011 an additional eight forms of entry
(240 reception age places) needed to be created by either expanding
existing schools or by establishing a new school in order to meet
the increased demand for school places.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Officer report attached at Appendix A to
the report outlined the future demand for primary school places in
the borough, together with options for providing places in order to
meet the increasing demand.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;b&gt;Resolved:&lt;/b&gt; That we agree (i) in principle to create an
additional eight forms of entry of primary school places for
September 2011 in accordance with the options contained in
paragraph 5 of the Officer report&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;(ii) that Officers can put
in place contingency arrangements for 2009/10;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;(iii) that Officers
undertake the pre-statutory consultation on proposals to establish
additional eight forms of entry of primary school places for
September 2011 in accordance with Part 2, section 19 of the
Education and Inspections Act 2006; and&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;text-align:left; tab-stops:list 0cm 70.9pt&quot;&gt;
(iv) &lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;to receive a further
report following the pre-statutory consultation in order to inform
Cabinet of detailed proposals for the provision of additional eight
forms of entry for September 2011 and obtain approval to undertake
the statutory process.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31683&quot;&gt;&lt;/a&gt;12.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35114&quot; title=&quot;Link to document 'Primary Strategy for Change (CAB/12/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Primary Strategy for Change (CAB/12/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 579 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;We had a report which detailed how in December
2007 the Department for Children Schools and Families (DCFS)
announced that they were introducing a Primary Capital Programme to
enable a long term strategic investment in primary school
buildings.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;The
amount of capital programme funding that would be available
nationally had been announced for the financial years 2009 through
to 2011. The indicative allocations for Redbridge in 2009-2010 and
2010 -2011 had been published. These were&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; &amp;pound;4,004,563 in 2009-10 and
&amp;pound;6,302,563 in 2010-2011.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;In order to access this resource each local
authority was required to produce a Primary Strategy for Change.
Initial investment priorities were identified in line with
prescribed criteria.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Times New Roman\&quot;;mso-fareast-font-family: \&quot;Arial Unicode MS\&quot;&quot;&gt;
&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;Redbridge had now received an unconditional
approval for the implementation of its&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; Primary Strategy for Change. As a
result the DCSF on 11 November 2008 announced that the indicative
capital allocations to Redbridge for 2009-10 and 2010-11, set out
in 1.2 above, were confirmed with immediate effect.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b style=&quot;q-bidi-font-weight:normal&quot;&gt;Resolved:&lt;/b&gt; That we note the
allocation of primary capital funding of &amp;pound;4,004,563 in
2009-10 and &amp;pound;6,302,563 in 2010-2011 from the DCSF in line
with the initial investment priorities set out in the Primary
Strategy for Change.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31446&quot;&gt;&lt;/a&gt;13.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35094&quot; title=&quot;Link to document 'Adoption of Agreed Syllabus for Religious Education (CAB/13/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Adoption of Agreed Syllabus for Religious Education (CAB/13/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 34 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35095&quot; title=&quot;Link to document 'syllabusforREAppdx' pdf file&quot;&gt;syllabusforREAppdx, item13.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 243 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35096&quot; title=&quot;Link to document 'syllabusforREAppdx2' pdf file&quot;&gt;syllabusforREAppdx2, item13.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 24 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;This report described how each local Authority
(LA) had to have a locally agreed syllabus for religious education
which was binding on all non-denominational schools.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;An Agreed Syllabus Conference was convened in
order to prepare the local agreed syllabus which then became
binding on schools when it was formally adopted by the
Authority.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; A local
agreed syllabus had to be reviewed within five years of its
adoption.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The present Redbridge Agreed Syllabus for
Religious Education was adopted in 2001.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;A new Redbridge Agreed Syllabus Conference was
convened in 2007 and had prepared a new locally agreed
syllabus.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The document
which it was proposed Cabinet now adopt had been prepared after
extensive consultation with individuals and groups, including
schools and religious communities.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The new agreed syllabus would become statutory
upon adoption by the Authority though schools have been advised
that they would not be required to implement it fully until
September 2009.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That we agree to formally
adopt the syllabus appended to the report as the new Redbridge
Agreed Syllabus for Religious Education.&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31685&quot;&gt;&lt;/a&gt;14.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35115&quot; title=&quot;Link to document 'Proposed Children's Centre at Gearies Infants School (CAB/14/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Proposed Children's Centre at Gearies Infants School (CAB/14/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 83 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35116&quot; title=&quot;Link to document 'GeariesPlans' pdf file&quot;&gt;GeariesPlans, item14.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 131 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report presented proposals for the
establishment of a Children&amp;rsquo;s Centre at Gearies Infants
School. A report was presented to Cabinet on 20&lt;sup&gt;th&lt;/sup&gt;
February 2007 giving details of the Government&amp;rsquo;s 10 year
Childcare Strategy and proposals for establishing a number of
Children&amp;rsquo;s Centres in Redbridge. Children&amp;rsquo;s Centres
would play a central role in delivering improved outcomes for all
young children and in reducing inequalities between the most
disadvantaged children and the rest.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; They were at the heart of the
Government&amp;rsquo;s &amp;ldquo;Every Child Matters: Change for Children
Programme&amp;rdquo;.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Department split the Children&amp;rsquo;s
Centre programme into three phases for Children, Schools and
Families&amp;rsquo; (DCSF) Sure Start Unit. In Phase 1 (2004-2006) four
Children&amp;rsquo;s Centres were established in Redbridge. In Phase 2
(2006-2008) Redbridge was developing an additional 10
Children&amp;rsquo;s Centres.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; Phase 2 had been slipped
nationally for one year to extend the completion of Phase 2
Children&amp;rsquo;s Centres.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&amp;nbsp;&lt;/span&gt; A further 8 were to be
established in Phase 3 (2008-2010).&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report also presented the outline scheme
and estimate for the proposed children&amp;rsquo;s centre. It sought
approval to apply the budget for this scheme as required by
Standing Order 125.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt; That
we&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; (i) agree to the
establishment of a Children&amp;rsquo;s Centre at Gearies Infants
School;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;tab-stops:list 0cm&quot;&gt;
(ii) agree the outline scheme for the proposed Children&amp;rsquo;s
Centre at Gearies Infants School as further described in Appendix A
and shown in Appendix B to the report;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;tab-stops:list 0cm&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;tab-stops:list 0cm&quot;&gt;
(iii) agree the outline estimate in the sum of &amp;pound;677,628 for
the proposed Children&amp;rsquo;s Centre at Gearies Infants School as
further described in Appendix A and shown in Appendix B to the
report; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;tab-stops:list 0cm&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;tab-stops:list 0cm&quot;&gt;
(iv) authorise the Chief Property Manager to proceed with the
detailed design and to procure the necessary works in accordance
with Standing Orders.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31686&quot;&gt;&lt;/a&gt;15.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35117&quot; title=&quot;Link to document 'Update on the progress with the Loxford School of Science and Technology One School Pathfinder Building Programme (CAB/15/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Update on the progress with the Loxford School of Science and Technology One School Pathfinder Building Programme (CAB/15/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 47 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35118&quot; title=&quot;Link to document 'LoxfordAppdx' pdf file&quot;&gt;LoxfordAppdx, item15.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 15 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:7.05pt; margin-bottom:12.0pt;margin-left:0in;text-align:left&quot;&gt;
&lt;span style=&quot;q-bidi-font-family: Arial;color:black&quot;&gt;The report
detailed how at its meeting on 2&lt;sup&gt;nd&lt;/sup&gt; October 2007, Cabinet
agreed that the Stage One contract for construction of the Loxford
Building Schools for the Future One School Pathfinder (BSF OSP)
project should be awarded to Willmott Dixon Limited.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:7.05pt;margin-bottom: 12.0pt;margin-left:0in;tab-stops:list 56.7pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family: Arial;color:black&quot;&gt;At its meeting
on 15&lt;sup&gt;th&lt;/sup&gt; April 2008, Cabinet agreed that the Stage Two
contract for construction of the Loxford Building Schools for the
Future One School Pathfinder (BSF OSP) project would also be
awarded to Willmott Dixon Limited.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:7.05pt;margin-bottom: 12.0pt;margin-left:0in;tab-stops:list 56.7pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family: Arial;color:black&quot;&gt;These awards
excluded the provision of Information and Communications Technology
(ICT), associated services and the provision of fixed furniture and
equipment (FF&amp;amp;E) which was the subject of a separate
procurement.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:7.05pt;margin-bottom: 12.0pt;margin-left:0in;tab-stops:list 56.7pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-family: Arial;color:black&quot;&gt;This report
provided Members with an update on the current position in relation
to the main building contract and the associated budgetary
position. It also advised Members of the risks that the project was
running and the contingency arrangements that were in
place.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoBodyTextIndent2&quot; style=&quot;margin-top:0in;margin-right:0in; margin-bottom:0in;margin-left:3.7pt;margin-bottom:.0001pt;text-align:left; tab-stops:list 70.9pt&quot;&gt;
&lt;b&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;Resolved:&lt;/span&gt;&lt;/b&gt;
&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;That we note (i) that the
Director of Children&amp;rsquo;s Services (in consultation with the
Director of Environment Regeneration &amp;amp; Community
Safety&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; and the Cabinet
Member for Children&amp;rsquo;s Services) have signed the relevant
contractual documentation to support the rebuild of Loxford
School;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:3.0pt; margin-bottom:0in;margin-left:3.7pt;margin-bottom:.0001pt;text-align:left; tab-stops:list .05in&quot;&gt;
&lt;span style=&quot;q-size:10.0pt;q-bidi-font-size:10.0pt; q-bidi-font-family:Arial;color:black&quot;&gt;
&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:14.75pt; margin-bottom:0in;margin-left:3.7pt;margin-bottom:.0001pt;text-align:left; tab-stops:list .05in&quot;&gt;
&lt;span style=&quot;q-bidi-font-family:Arial;color:black&quot;&gt;(ii) the current
projected outturn for the building works; and&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0in;margin-right:14.75pt; margin-bottom:0in;margin-left:3.7pt;margin-bottom:.0001pt;text-align:left; tab-stops:list .05in&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:3.7pt;text-align:left; tab-stops:list .05in&quot;&gt;(iii) the
major risks that still exist in relation to the rebuild.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31448&quot;&gt;&lt;/a&gt;16.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35097&quot; title=&quot;Link to document 'References to Cabinet - Environment and Highways Portfolio - Budgetary Comments (CAB/16/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;References to Cabinet - Environment and Highways Portfolio - Budgetary Comments (CAB/16/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 39 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;The terms of
reference for all Scrutiny Committees included aspects of
monitoring policy, performance service delivery and the allocation
and use of resources and requested consideration by
Cabinet.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; Specifically
Standing Order 6.3 (e) provided for Scrutiny Committees to:-&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0cm;margin-right:7.05pt;margin-bottom: 0cm;margin-left:1.0cm;margin-bottom:.0001pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-size: 10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0cm;margin-right:7.05pt;margin-bottom: 0cm;margin-left:18.0pt;margin-bottom:.0001pt&quot;&gt;
&amp;ldquo;Propose and recommend to Cabinet improvements to the
Council&amp;rsquo;s services, &lt;span style=&quot;color:black&quot;&gt;functions and
policies.&amp;rdquo;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-top:0cm;margin-right:7.05pt;margin-bottom: 0cm;margin-left:2.0cm;margin-bottom:.0001pt&quot;&gt;
&lt;span style=&quot;q-bidi-font-size: 10.0pt;color:black&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;&lt;span style=&quot;color:black&quot;&gt;The former Highways and Cleansing Scrutiny
Committee&amp;rsquo;s work (now the&lt;/span&gt; &lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;color:black;mso-ansi-language:EN-US&quot;&gt;Environment
and Highways Scrutiny Committee)&lt;/span&gt;&lt;span style=&quot;color:black&quot;&gt;,
had made two references to Cabinet which fell within the remit of
the&lt;/span&gt; &lt;span xml:lang=&quot;EN-US&quot; lang=&quot;EN-US&quot; style=&quot;color:black;mso-ansi-language:EN-US&quot;&gt;Environment
and Highways&lt;/span&gt; &lt;span style=&quot;color:black&quot;&gt;portfolio.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&amp;nbsp;&lt;/span&gt;
The references related to Environmental Highways Schemes and
Parking Revenue Surpluses.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;tab-stops:list 78.0pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family:Arial;color:black; q-bidi-font-weight:bold&quot;&gt;
&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt;tab-stops:list 78.0pt&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial;color:black;q-bidi-font-weight:bold&quot;&gt;The&lt;/span&gt;
&lt;span style=&quot;color:black&quot;&gt;references were formally presented to
Cabinet on 1&lt;sup&gt;st&lt;/sup&gt; July 2008, which resolved to
r&lt;/span&gt;&lt;span style=&quot;layout-grid-mode:line&quot;&gt;equest Officers to
prepare a detailed response to each of the references, for
consideration at a Cabinet meeting within the next two cycles of
its meetings.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-family:Arial;color:maroon;q-bidi-font-weight:bold&quot;&gt;
&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;&lt;span style=&quot;color:black&quot;&gt;The references related&lt;/span&gt; to the
portfolio&amp;rsquo;s budget and were set out in Paragraph 1.2 of the
Officer report, which was &lt;span style=&quot;q-bidi-font-family: Arial;q-bidi-font-weight:bold&quot;&gt;attached as
Appendix A to the report.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&lt;b&gt;Resolved:&lt;/b&gt;&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; That
we (i) consider the references from the former Highways and
Cleansing Scrutiny Committee (now the Environment and Highways
Scrutiny Committee) and the officer comments contained in Sections
2 and 3 of the report, and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(ii) note that the surplus revenue from Parking is applied in
meeting highways expenditure in accordance with the relevant
legislation.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI32177&quot;&gt;&lt;/a&gt;17.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35120&quot; title=&quot;Link to document 'Increase in Management Charges for Temporary Accommodation (CAB/17/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Increase in Management Charges for Temporary Accommodation (CAB/17/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 35 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.2pt&quot;&gt;The Council had a
duty to provide applicants who made a homeless application to the
Council with interim accommodation in either bed and breakfast or
nightly let units while their applications were still being
assessed. Once a family had been assessed as homeless the most
common form of temporary accommodation was a property leased by the
Council from the private sector.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.2pt&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.2pt&quot;&gt;The Council
incurred costs in managing this accommodation and make a management
charge to cover these costs. The current charge was &amp;pound;50 per
week.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; It was proposed
to increase this charge to &amp;pound;63 per week from 12&lt;sup&gt;th&lt;/sup&gt;
January 2009.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; This
increase in charges had been put forward as a savings option by
Housing as part of the 2009/10 budget process.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.2pt&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.2pt&quot;&gt;&lt;b&gt;Resolved:&lt;/b&gt;
&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;That we agree to a
&amp;pound;63 per week management charge for Nightly Let, Bed and
Breakfast and Private Sector Leased accommodation with effect from
Monday, 12&lt;sup&gt;th&lt;/sup&gt; January 2009.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31808&quot;&gt;&lt;/a&gt;18.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35103&quot; title=&quot;Link to document 'Post Office Closures (CAB/18/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;Post Office Closures (CAB/18/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 46 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Additional documents:&lt;/p&gt;
&lt;ul class=&quot;mgBulletList&quot;&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35104&quot; title=&quot;Link to document 'PostOfficesAppdxB' pdf file&quot;&gt;PostOfficesAppdxB, item18.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 542 KB&lt;/span&gt; &lt;/li&gt;
						&lt;li&gt;
						&lt;a href=&quot;mgConvert2PDF.asp?ID=35105&quot; title=&quot;Link to document 'PostOfficesAppdxC' pdf file&quot;&gt;PostOfficesAppdxC, item18.&lt;/a&gt; 
						&lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 11 KB&lt;/span&gt; &lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report arose from the Motion at the
Council meeting on the 17&lt;sup&gt;th&lt;/sup&gt; July when Council agreed the
following resolutions:&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Council:&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:54.0pt;text-indent:-36.0pt;mso-list:l0 level1 lfo2; tab-stops:list 54.0pt&quot;&gt;
(i)&lt;span style=&quot;font:7.0pt \&quot;Times New Roman\&quot;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/span&gt;
notes with regret the Government&amp;rsquo;s plans for the compulsory
closure of sub-post offices and the damaging effect of such
closures on local communities;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:54.0pt;text-indent:-36.0pt;mso-list:l0 level1 lfo2; tab-stops:list 54.0pt&quot;&gt;
(ii)&lt;span style=&quot;font:7.0pt \&quot;Times New Roman\&quot;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/span&gt;
notes with regret the failure of the Members of Parliament for
Ilford South and Leyton and Wanstead to support motions calling
upon the Secretary of State for Business, Enterprise and Regulatory
Reform to instruct Post Office Limited to suspend the compulsory
closure of sub-post offices while options for business expansion
and developing business opportunities with local authorities should
be explored further; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:54.0pt;text-indent:-36.0pt;mso-list:l0 level1 lfo2; tab-stops:list 54.0pt&quot;&gt;
(iii)&lt;span style=&quot;font:7.0pt \&quot;Times New Roman\&quot;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/span&gt;
calls on the Cabinet to give consideration to all means available
to support Post Offices in the London Borough of Redbridge.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The report provided Members with information
on Post Office Ltd&amp;rsquo;s first round of Post Office closures
called the &amp;lsquo;Urban Reinvention Programme&amp;rsquo; and the
current round of closures under the Network Change Programme.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;The
report listed those Post Office outlets intended for closure in
Redbridge and the approach the Council adopted to the public
consultation process conducted between 19&lt;sup&gt;th&lt;/sup&gt; February
2008 and 2&lt;sup&gt;nd&lt;/sup&gt; April 2008.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; A brief outline of this
Council&amp;rsquo;s formal consultation response to Post Office Ltd of
the 27&lt;sup&gt;th&lt;/sup&gt; March 2008 was also included.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family: Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Paragraph 6 of the Officer Report
highlighted the future sustainability of Redbridge Post Office
outlets and the measures the Council might wish to consider to
retain and sustain the remaining Post Office outlets in the
borough.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family: Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;One
option would be to encourage commercial premises that might wish to
have a Post Office outlet on their premises, should they apply.
Another option was that of co-location, where &amp;lsquo;failed&amp;rsquo;
(i.e. closed by Post Office Ltd) Post Office services might be
incorporated into an existing Council owned or operated
building.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; A map had
been prepared jointly by Planning and Regeneration and Property
Services that plotted both the location of local Post Office
outlets closed, together with Council-owned or operated buildings
that were within reasonable proximity that might be used for
co-location.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The map
was attached to the report as Appendix B.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-family: Arial&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;However, any future co-location or the
establishment of new outlets deployed with any local authority or
community group would need to be the subject of Local Funding
arrangements with Post Office Ltd.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&lt;b&gt;Resolved:&lt;/b&gt;&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; That
we (i) note the closure of five of the Borough&amp;rsquo;s Post Office
outlets;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(ii) seek to defend all remaining Post Offices against the threat
of future potential closure;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iii) encourage the use of commercial premises to locate Post
Office outlets where this is appropriate and potentially including
those premises where post offices previously existed; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iv) agree further research by Officers into the dual-use of
Council owned/operated premises.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(Councillors Cleaver and Littlewood spoke on this item)&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31458&quot;&gt;&lt;/a&gt;19.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
		
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a href=&quot;mgConvert2PDF.asp?ID=35106&quot; title=&quot;Link to document 'ICT Strategy - Annual Statement 2008 (CAB/19/021208)' pdf file&quot; class=&quot;mgAiTitleLnk&quot;&gt;ICT Strategy - Annual Statement 2008 (CAB/19/021208)&lt;/a&gt; &lt;span class=&quot;mgFileSize&quot;&gt;&lt;img src=&quot;mgimages/logo-pdf-1.gif&quot; height=&quot;10&quot; alt=&quot;pdf icon&quot; width=&quot;10&quot; /&gt; PDF 64 KB&lt;/span&gt; &lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold;q-bidi-font-style:italic&quot;&gt;The report
detailed how the Council&amp;rsquo;s Information and Communications
Technology (ICT) Strategy was two years old and set out a work
programme of strategic ICT projects designed to&lt;/span&gt; &lt;span style=&quot;q-bidi-font-style:italic&quot;&gt;support the delivery of corporate
objectives&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-right:7.05pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-style:italic&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-style:italic&quot;&gt;The
pace of technological change remained rapid and this demanded that
the Council took a flexible approach to the prioritisation of
resources and the procurement of key ICT facilities.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; In this light, the strategy must
continually evolve to meet the needs of the
organisation.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;
Reflecting this needed, last year Members&amp;rsquo; approved the
introduction of an Annual Statement.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-style: italic&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;tab-stops:67.2pt&quot;&gt;&lt;span style=&quot;q-bidi-font-style: italic&quot;&gt;The Annual Statement recorded the
progress of the key strategic projects over the last year and
defined the immediate challenges and new initiatives for the coming
year.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The benefit of
this approach was to ensure that Members, Officers and key
stakeholders were fully aware of the progression of ICT initiatives
and the Council could target its resources for maximum
effect.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;tab-stops:67.2pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-style:italic&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;tab-stops:67.2pt&quot;&gt;Following a review of
desktop provision, ICT Services initiated entry into the
Government&amp;rsquo;s e-auction for PC/Laptop equipment.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; By taking this innovative
approach, ICT Services sought to maximise the best value for the
Council, through a highly competitive tendering
mechanism.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; In July,
the Council participated in the e-auction process, which was won by
Insight Direct.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; In
this regard, the Council was now able to realise significant cost
savings.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;tab-stops:67.2pt&quot;&gt;&lt;span style=&quot;q-bidi-font-size: 10.0pt;q-bidi-font-style:italic&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&lt;b&gt;Resolved:&lt;/b&gt;&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; That
we (i) note the progress&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; to date in
implementing&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; the ICT
Strategy;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(ii) agree the revised programme of developments based on business
priorities and the associated financial projections for the ICT
Strategy in 2008/09 and in future years, subject to Council
funding;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iii) note the Council&amp;rsquo;s participation in the
Government&amp;rsquo;s e-auction process and the purchase of computer
equipment from the winner of the e-auction, Insight Direct;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(iv) agree to waive Contract Standing Orders 90, 91 and 92 and
authorise the Chief ICT Officer to purchase ICT equipment covered
by the e-auction from Insight Direct for the duration of the
e-auction agreement; and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left;mso-pagination:none&quot;&gt;
(v) note that the Chief ICT Officer shall purchase ICT equipment
and software not covered by the e-auction via the Central
Government Catalogue, Catalist in accordance with Catalist
guidelines, as permitted under Contract Standing Order 95.2 and
pursuant to this agree to waive Contract Standing Order 95.2(b)&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31439&quot;&gt;&lt;/a&gt;20.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Any other items which the Chairman decides for the reasons stated are urgent (CAB/20/021208)&lt;/p&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;None.&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31440&quot;&gt;&lt;/a&gt;21.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
					&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Motion to exclude the public (CAB/21/021208)&lt;/p&gt;
&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;The
following motion will be moved where it is desired to discuss
business containing exempt information in private:-&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;&amp;ldquo;That under Section 100A(4) of the
Local Government Act 1972 the public be excluded from the meeting
of business on the grounds that it involves the likely disclosure
of exempt information as described in the paragraphs indicated
below of Part I of Schedule 12A to the Act.&amp;rdquo;&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;That under
Section 100A(4) of the Local Government Act 1972 the public be
excluded from the meeting for the following items of business on
the grounds that they involve the likely disclosure of exempt
information as described in Part 1 of Schedule 12A to the
Act.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;Minute 22
(CAB/22/021208) paragraph 3&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-family:\&quot;Myriad Pro\&quot;&quot;&gt;Minute 23
(CAB/23/021208) paragraph 3.&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31593&quot;&gt;&lt;/a&gt;22.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
						&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Award of the Banking Contract - 1st April  2009 (CAB/22/021208)&lt;/p&gt;

&lt;ul class=&quot;mgActionList&quot;&gt;
			&lt;li&gt;&lt;a href=&quot;mgReasonsRestricted.asp?ID=35107&amp;amp;OID=31593&amp;amp;OT=A&amp;amp;RPID=374222&amp;amp;BM=AI31593&quot; title=&quot;Link to reasons restricted for item 22.&quot;&gt; View the reasons why  item 22. is restricted&lt;/a&gt;&lt;/li&gt;

&lt;/ul&gt;
&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;This report informed Members of the tender and
subsequent evaluation process undertaken to determine the award of
the Contract for Banking Services.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The contract comprised the provision of a cash
management service to all the Council's Bank Accounts and
Schools.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; This service
was currently provided by the National Westminster Bank, now part
of the Royal Bank of Scotland group.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The contract expires on the 31st
March 2009.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;The Council invited tenders for a new contract
to commence from the 1st April 2009.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; The tender procedure complied
with European procurement requirements.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:left&quot;&gt;&lt;b style=&quot;q-bidi-font-weight: normal&quot;&gt;&lt;span style=&quot;q-bidi-font-family:Arial&quot;&gt;Resolved:&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt; &lt;span style=&quot;q-bidi-font-family: Arial;q-bidi-font-weight:bold&quot;&gt;That we approve
the appointment of the Royal Bank of Scotland plc for a five year
period from 1&lt;sup&gt;st&lt;/sup&gt; April 2009 with the option of five one
year extensions thereafter.&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
		&lt;tr&gt;

			&lt;td class=&quot;mgItemNumberCell&quot;&gt;&lt;p class=&quot;mgAiTitleTxt&quot;&gt;&lt;a name=&quot;AI31811&quot;&gt;&lt;/a&gt;23.&lt;/p&gt;&lt;/td&gt;
				
		&lt;td&gt;			
						&lt;p class=&quot;mgAiTitleTxt&quot;&gt;Oakfield Playing Fields - Redbridge Sports Centre Trust (CAB/23/021208)&lt;/p&gt;

&lt;ul class=&quot;mgActionList&quot;&gt;
			&lt;li&gt;&lt;a href=&quot;mgReasonsRestricted.asp?ID=35108&amp;amp;OID=31811&amp;amp;OT=A&amp;amp;RPID=374222&amp;amp;BM=AI31811&quot; title=&quot;Link to reasons restricted for item 23.&quot;&gt; View the reasons why  item 23. is restricted&lt;/a&gt;&lt;/li&gt;

&lt;/ul&gt;


&lt;p class=&quot;mgSubItemTitleTxt&quot;&gt;Minutes:&lt;/p&gt;&lt;div class=&quot;mgWordPara&quot;&gt;&lt;div class=&quot;Section1&quot;&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;Oakfield
Playing Fields comprised some 25 hectares (62 acres) of land owned
freehold by Redbridge Council, which was used for a variety of
recreational purposes.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;
This land was leased to three organisations including the Redbridge
Sports Centre Trust Ltd. (RSCT). The RSCT owned a part of the site
freehold extending to some 1 hectare (2.5 acres) and a plan showing
the land ownerships was attached as Appendix 2 to the
report.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;The
RSCT, which was a registered charity, occupies some 8.5 hectares
(21 acres) under two leases and has built up a good track record in
building, operating and managing part of the Oakfield site for
sporting and recreation purposes, which benefited the wider
community.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;RSCT
were seeking to invest some &amp;pound;5m in a new proposed Olympic
standard badminton facilities as shown on a Plan at Appendix 3,
which could be used for training purposes for the 2012 London
Olympics.&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt; Planning
consent for the proposed development had been obtained.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-weight:bold&quot;&gt;To
obtain the necessary funding to provide this facility RSCT were
seeking the transfer of the freehold of part of the land they
currently lease from the Council.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;q-bidi-font-size:10.0pt;q-bidi-font-weight: bold&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:2.25pt&quot;&gt;&lt;span style=&quot;q-bidi-font-weight: bold&quot;&gt;The report set out options that would
enable the RSCT to provide Olympic standard badminton facilities.
These options would provide improved sporting facilities within the
Borough and could, subject to planning, also enable Redbridge
Council to be able to support its Capital Programme by enabling
longer-term future land sales.&lt;/span&gt;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;font-weight: bold; margin-left: 2.25pt; text-align: left&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:2.25pt;text-align:left&quot;&gt;
&lt;b&gt;Resolved:&lt;span style=&quot;mso-spacerun: yes&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/b&gt; That
(i) we authorise the Director of Environment, Regeneration and
Community Safety, in consultation with the Cabinet Member for
Resources and Communication, to agree terms for the freehold
transfer of some 5 hectares (12.5 acres) shown cross-hatched on
Appendix 2 to the Redbridge Sports Centre Trust Ltd (RSCT) and to
secure the surrender of some 3.5 hectares (8.5 acres) of the
RSCT&amp;rsquo;s existing leasehold interest in the area shown hatched
on Appendix 2 and the grant of a short term lease for the interim
management of that land to the RSCT, and&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-left:2.25pt;text-align:left&quot;&gt;
&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;(ii) the Director of Environment, Regeneration
and Community Safety write to the RSCT advising of Cabinet&amp;rsquo;s
agreement of (i) above, to assist the RSCT in obtaining their
funding whilst the necessary agreements are formalised.&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot;&gt;&amp;nbsp;&lt;/p&gt;
&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align:center&quot;&gt;Chairman&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;		&lt;/td&gt;
		&lt;/tr&gt;
		
	&lt;/table&gt;
&lt;div class=&quot;mgHelpLine&quot;&gt;&lt;/div&gt;&lt;/div&gt;</raw-body>
  <title>Minutes for Cabinet meeting, Dec  2 2008,  7.15PM</title>
  <updated-at type="datetime">2012-01-17T12:34:40+00:00</updated-at>
  <url>http://moderngov.redbridge.gov.uk/ieListDocuments.asp?CId=267&amp;MId=4446&amp;Ver=4</url>
  <title>Minutes for Cabinet meeting, Dec  2 2008,  7.15PM</title>
  <openlylocal-url>http://openlylocal.com/documents/2421-Minutes-for-Cabinet-meeting-Dec-2-2008-7-15PM</openlylocal-url>
  <status nil="true"></status>
</document>

